Laserfiche WebLink
� <br /> � <br /> � <br /> � <br /> � Pmposed assessments are computed on a front foot basis, assuming a 75' minimum and 90' <br /> maximum assessable footage to residential property in areas where new concrete curb is constructed <br /> j and in areas where existing concrete curb will be saved. The estimated assessments to residential <br /> property on a typica133 foot wide street (back-to-back) are summarized in Table 1. <br /> � <br /> Table 1 Estimated Street Asse.SSments <br /> � Reconstruct save most elristin concrete curb <br /> , <br /> 75' minimum frontage $2,371l1ot <br /> 90' maximum frontage $2,547/Iot <br /> � <br /> Reconstruct, instail new concrete curb <br /> � 75' minimum frontage $2,939/lot � <br /> 90' maximum frontage $3,526/lot I <br /> � <br /> 1Vlill and Overlav <br /> �` I <br /> 75' minimum frontage $170/lot <br /> 90' maximum frantage $200/lot I <br /> � <br /> The estimated cost for the overall program proposed herein and presented on Figare No. 2 is <br /> � summarized in Table 2. <br /> � <br /> � <br /> � <br /> � <br /> � ' <br /> ' Centerville Pavement Management Study 6 <br />