Laserfiche WebLink
i i � <br /> I <br /> � <br /> � Table 2- Yearly Estimated Cost Summaiy <br /> Item Resident Cost Ci Cost Pro'ect Cost <br /> � ty a <br /> � 2004 Seal Coat $0 $120,300 $120,300 <br /> 2004 Reconstruct $639,700 $1,9b6,7UQ $2,606,400 <br /> � 2004 Mill-Ovexlay $8,100 $72,200 $80,300 <br /> ' 2004 Utilities $713,000 $254,000 $967,OQ0 <br /> � 2006 Seal Coat 0 96 40Q 95 400 <br /> $ $ , $ , <br /> � 2009 Reconstruct $583,300 $1,871,100 $2,454,400 <br /> � 2009 Mill-Ovezlay $11,900 $107,100 $119,000 <br /> 2009 Utilities (est) $175,OQ0 $175,000 $350,400 <br /> � TOTAL $2,131,000 $4,662,800 $6,793,80ti <br /> � Policy Decisions and Recommendations <br /> � T'he City has various optians on how it elects to maintain its bituminQUS surfaced streets. As noted <br /> previously, many streets were constructed without gtanular subgrade materiat and draintile. As a <br /> result, these streets will need to be reconstructed at some point to meet City Street standards. Miil <br /> �' and overlay techniques can be used on streets that ex rience frost boils in the s rin . <br /> Pe P g <br /> � The ma�orit of maintenance from 2003 — 2009 will involve reconstruction and seal coatin . The <br /> J Y S <br /> � streets bordered by Main Street, 20`� Avenue, 73 � Street and Mill Road all were constructed in the <br /> � late 1980's — early I990's. Their concrete curbs aze generally in good condition, but the driven <br /> � roadway areas are showing signs of significant deterioration. Seal coating these streets will not <br /> � increase their life, and reconstruction is the recommended im rovement method. Newer streets will <br /> P <br /> � require crack sea�ing and seal coating on a regular basis, in addition to occasional mil] and overlay. <br /> I �� It is recommended the City present this Capital Improvement Study to citizens and property owners <br /> ' at a City Council meeting. Additional informational meetings would be held specificaily for those <br /> I � property owners included in the street project proposed for that year, and feasibility reports prepared. <br /> � <br /> ' <br /> �� Centerville Pavement Management Study � <br /> I <br />