Laserfiche WebLink
Street Reconstruction Cost Estimate �!/. � i <br /> "R' <br /> Cl5 �dth 58 ft 30 ft 38 ft 30 ft I <br /> COUNiI' OVERIAY COSTS I <br /> MOBILIZATION LS $5,000.00 7 $5,OQ0.00 � <br /> TRAFFIC CONTROL LS E5,000.00 1 55,000.00 <br /> MILLING SY 51.50 2,456 $3,683.33 � <br /> BITUMINOUS PATCHING (REM. & REPLAC� SY $15.00 500 57,500.00 <br /> BITUMINOUS MATERIAL FOR TACK COAT GL 82.20 123 5270.11 <br /> iYPE SP 4 BITUMINOUS MIXTURE TN b60.00 270 $16,206.67 <br /> 4" DOUBLE SOLID LINE, YELLOW EPDXY LF 51.00 850 $850.00 <br /> 4" SOLID LINE, WHfTE EPDXY Li $0.50 1,700 $850.00 <br /> 12" SOLtD STOP LINE (BAR), WHITE EP()XY LF E9.00 24 $216.00 <br /> PAVEMENT MESSAGE, LEFT TURN ARROW - EPDXY EA $150.00 2 $300.00 <br /> CoraUUCtion Cost $39,876.11 <br /> Contingenceis (5%) Et,993.81 <br /> Engineering, Admin., Legal, Bonding (3096) 511,962.83 <br /> Total Project Costs 553,832J5 <br /> I:\616\61607161\Design\Cost Estimates for Report.xis <br />