Laserfiche WebLink
i <br /> I <br /> Sanitary Sewer Cost EsUmate I <br /> � Bonestroo <br /> i <br /> � <br /> Sanitary Sewer - Phase 2-4 <br /> Option 1 OpUon 2 <br /> r No. Item Units Unit Price Qty Total Price Qty Total Price <br /> 1 Remove sanitary pipe LF S1 0 $0 360 $360 <br /> 2 Abandon Sanftary Pipe In-Place LF S2 0 $0 100 $200 <br /> 3 Remove sanitary manhole EA 5500 0 $0 2 $1,OQU <br /> 4 Connect to existing sanitary sewer EA $2,000 0 $0 0 $0 <br /> 5 4' diameter sanicary manhole EA E2,500 8 $20,000 17 $42,SU� <br /> 6 8"x4" Wye EA 5125 0 $0 46 $5,750 <br /> 7 8"xs" Wye EA E150 6 $900 0 $� <br /> 8 4" Servke Pipe LF $15 0 SO 460 Y6,900 <br /> 9 6" Service Pipe Lf E17 180 $3,060 0 $0 <br /> 10 PVC sanitary pipe LF $35 1250 E43,750 3085 $107,975 <br /> 11 N Inspection LF $1 1250 $1,250 3085 $3,085 <br /> Construction Cost 568,960 3167,770 <br /> CoMingencies (5%) $3,448.OU f8,388.50 <br /> Engineering (30%) $20,688.0 $50,331.0 <br /> Total Cost 593,096 5226,49a <br /> I:\616161607161\Design\Cost Estimates for Report.xls <br />