Laserfiche WebLink
i <br /> Rob Faust <br /> Eagie Scout Project Plan <br /> Garden hoe <br /> Level <br /> Work gloves for people digging holes <br /> Labor <br /> For the digging/concrete day, I will need about 10 scouts and 2-3 leaders. <br /> This portion will take about 5 hours. <br /> For the installation day, I will need 2-3 scouts and a leader. If I need help <br /> raising the flag, I will contact the Centerville Fire Department. It will take <br /> about and hour, up to two. <br /> 3. Landscaoina <br /> r---_ <br /> Plan: After the pole is up, I will landscape it. The basic idea is a 10 ft circle of rocks with <br /> boulders surrounding it with 5 Daub's frosted juniper plants. A detailed plan is attached. <br /> The design concept is durable, drought tolerant plants that require little pruning. <br /> Items to Purchase ', <br /> 5 Daub's frosted juniper plants at-$31.99 $159.95 <br /> 15 boulders 10" in diameter at-10 cents/Ib 15.00 �� <br /> 1 cubic yard of 1.5" river rock 47.99 �, <br /> Delivery 40.00 ' <br /> 32' of vinyl edging 51.96 � <br /> Total Cost $314.90 ', <br /> Tools✓Supplies I , <br /> Rakes ', <br /> Gardening gloves ' <br /> Shovels <br /> Labor <br /> I will need about 5-6 scouts and 1 or 2 adults for about 4 hours. <br /> 4 �.�,qht� <br /> Plan: l will have an electrician help me install a floodiight. I will ask through troop or <br /> friends for an electrician. Light will be placed 10-15 ft. away from pole. <br /> Items to Purchase <br /> Light $200.00 <br /> Lighting footing ?? <br /> Photosensor ?? <br />