My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2011
>
2011-07-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2011 3:41:39 PM
Creation date
7/8/2011 3:41:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Centerville <br /> Council Meering <br /> June 22, 2011 <br /> Heritage Street, Sorel Street and Mill Road early or mid July. MNDOT may be able to work <br /> through a shutdown on some aspects of the project, but may not be able to inspect blacktop or <br /> concrete. Council discussed briefly the possibility of hiring an inspector outside of MNDOT to <br /> provide material certification on asphalt and concrete. <br /> City Engineer Statz also informed Council he was waiting for an update from MNDOT on the <br /> problem with the colored concrete on Main Street and Centerville Road. <br /> Council Member Paar reported there was Fete des Lacs meering on Tuesday, June 21 attended by <br /> representatives of the Ham Radio Club, Police Department and Centerville Lions to discuss and <br /> coordinate events. <br /> Bud et Work Session was scheduled for the Jul 27 2011 Council meetin followin the re lar <br /> g Y � g g 8u <br /> meeting. <br /> X. ADJOURNMENT <br /> Motion bv Council Member Fehrenbacher, seconded bv Council Member <br /> Paar, to Adiourn the Meeting of June 22, 2011 at 7:57 n.m. All in favor. Motion Passed <br /> Unanimouslv. <br /> Transcribed by City Staff: Kim Stephan <br /> Page 4 of 4 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.