My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-04-08 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-04-08 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2011 8:30:56 AM
Creation date
8/22/2011 8:30:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
irx� c� -. »o ao•.�c ..i ur �:ivu u-rt�c� b112 -64 4bd H. UY <br /> I#A 4Z f f <br /> JOINT POWERS AGREEMENT <br /> BETWEEN THE CITY OF LINO LAKES <br /> AND THE CITY OF CENTERVILLE <br /> REGARDING 21ST AVENUE ROADWAY <br /> IMPROVEMENTS AND MAINTENANCE <br /> THIS AGREEMENT, made and entered into on the day and year hereinafter set <br /> forth by and between the City of Lino Lakes and the City of Centerville; both of which <br /> are governmental subdivisions of the State of Minnesota located in the County of Anoka. <br /> RECITALS <br /> a. The City of Lino Lakes and the City of Centerville desire to improve 21 st <br /> Avenue by constructing street, curb and gutter and storm sewer between Main Street and <br /> the south line of Centerville Industrial Park, <br /> b. The City of Lino Lakes has prepared a feasibility study of the Project <br /> south of Main Street and both cities agree to construct the Project, in phases, as described <br /> in the feasibility study. <br /> C. A portion of the Project is to be constructed within the corporate limits of <br /> the City of Lino Lakes and a portion is to be constructed within the Corporate limits of <br /> the City of Centerville. Phase 1 of the Project is located along the 21 st Avenue alignment <br /> between Main Street and the south line of the Centerville Industrial Park. (Exhibit A) <br /> d. Subject to the terms hereof, Lino Lakes is assuming full responsibility for <br /> the design and construction of the Project to be built both within the corporate limits of <br /> Lino Lakes and Centerville. <br />
The URL can be used to link to this page
Your browser does not support the video tag.