Laserfiche WebLink
DRAFT MARCH 20, 1998 <br /> SECTION 1. GENERAL CONDITIONS <br /> 1. In consideration of the covenants and agreements herein set forth, Centerville <br /> shall construct a water system connection to the public water system of Lino Lakes subject to <br /> all terms, conditions, and provisions of this Agreement as hereinafter expressed. <br /> 2. Water flow recording meters shall be installed at the interconnection line for the <br /> purpose of measuring the flow from the Lino Lakes water system into the Centerville water <br /> system and the flow from the Centerville water system into the Lino Lakes water system. <br /> 3. Lino Lakes shall have ownership and be responsible for operation and <br /> maintenance of the water line located within the corporate boundaries of Lino Lakes. <br /> Centerville shall have ownership and be responsible for operation and maintenance of the <br /> interconnection line, metering manhole, and appurtenances of the water lines located within the <br /> corporate boundaries of Centerville. <br /> 4. Centerville shall commence with the design of the metering manhole within 60 <br /> days of the date of agreement. Centerville shall, within nine (9) months from the date of this <br /> agreement, construct and have operational the metering manhole. <br /> 5. The meter shall operate automatically according to an agreed upon telemetry <br /> system to provide each City with water during an emergency condition. <br /> 6. The City of Centerville shall complete the construction of a water storage <br /> reservoir within a minimum of 8 years from the date of execution of this Agreement. The <br /> City of Lino Lakes may extend the time period for the City of Centerville to construct the <br /> water storage reservoir based on recommendations from the Lino Lakes Comprehensive <br /> Water Plan. <br /> 0'.*Oi 260085WS5.2303AbJohAUUge Page 2 <br />