My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-03-11 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-03-11 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2011 10:52:21 AM
Creation date
8/22/2011 10:52:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memorandum March 6, 1998 <br /> TO: Mr. Jim March, Administrator, City of Centerville <br /> Mr. Paul Palzer, Public Works Director, City of Centerville <br /> FROM: David E. Nyberg, P.E. <br /> SUBJECT: SHEENY CONSTRUCTION PROPERTY <br /> PROPOSED RIGHT -OF -WAY <br /> 21ST AVENUE CORRIDOR <br /> As requested, we called Mr. Mike Sheehy of Sheehy Construction to discuss the <br /> possibility of acquiring right -of -way along the Sheehy property, for the proposed 21st <br /> Avenue road along the Lino Lakes /Centerville corporate Boundary. <br /> According to Mike, he was not aware of any plans to construct a road along the 21st <br /> Avenue corridor. I explained the plans to him, with the road proposed to be constructed <br /> approximately 1/3 of the distance through his property from the north property line. <br /> Mike said that they are not in favor of the road continuing along his property. He is not <br /> opposed to the project altogether, but said Sheehy Construction constructed their <br /> building as far back from 20th Avenue as possible to minimize potential complaints on <br /> the use of the building and property for storage. The facility is currently used for storage <br /> of equipment and materials. Mike said they have no plans to develop the property for at <br /> least 10 years. <br /> I asked Mike about acquiring right -of -way along the property boundary. Mike said they <br /> would accept this and know that the road will eventually extend through their property. <br /> He said they would expect fair compensation and requested that the negotiation include <br /> salvaging and installing the chain link fence along the facility. <br /> 0 Apraj\802690 \690 -0602.mar <br /> OP Howard R. Green Company <br /> CONSULTING ENGINEERS <br /> 1326 Energy Park Drive • St. Paul, Minnesota 55108 <br /> Phone: 612/644 -4389 • Fax: 612/644 -9446 • Toll Free 1- 8001888- 368 -4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.