Laserfiche WebLink
Right of Way Summary <br /> 21st Avenue Corridor <br /> Automotive Driveline <br /> Length 200 ft. Width 7 ft. Area 1,400 sq. ft. <br /> Cost per square foot $3.00 <br /> Total R/W Cost $4,200.00 <br /> Noble Welding <br /> Length 200 ft. Width 7 ft. Area 1,400 sq. ft. <br /> Cost per square foot $3.00 <br /> Total R/W Cost $4,200.00 <br /> Arcade Asphalt <br /> Length 200 ft. Width 7 ft. Area 1,400 sq. ft. <br /> Cost per square foot $100 <br /> Total R/W Cost $4,200.00 <br /> Sheehy Construction <br /> Length 670 ft. Width 40 ft, Area 26,800 sq. ft. <br /> Cost per square foot $3.00 <br /> Total R/W Cast $80,400.00 <br /> Herman Strehlow <br /> Length 676 ft. Width 40 ft, Area 27,040 sq. ft. <br /> Cost per square foot $3.00 <br /> Total R/W Cost $81,120.00 <br /> Joyce Stevens <br /> Length 667 ft. Width 40 ft. Area 26,680 sq. ft. <br /> Cost per square foot $3.00 <br /> Total R/W Cost $80,040.00 <br /> Gerald Rehbein <br /> Length 1097 ft. Width 40 ft. Area 43,880 sq. ft. <br /> Cost per square foot $3.00 <br /> Total R/W Cost $131,640.00 <br /> City of Centerville <br /> Length 205 ft. Width 40 ft. Area 8,200 sq. ft, <br /> Cost per square foot $3.00 <br /> Total R/W Cost $24,600.00 <br /> Total R/W Cost - 21st Ave Corridor $410,400.00 <br /> Right of Way Summary 3/6/98 <br />