Laserfiche WebLink
DRAFT - MARCH 6, 1998 <br /> All additional work will be within the proposed Parkview Addition or within <br /> City right -of -way. <br /> 5.2 Estimated Costs <br /> Construction Costs <br /> Sanitary Sewer Construction $ 69,085.00 <br /> Watermain Construction 66,460.00 <br /> Storm Sewer Construction 40,220.00 <br /> Street Construction Within Development 148,837.50 <br /> Sidewalk and Path Construction Within Development 26,050.00 <br /> Street and Sidewalk Construction Outside of Development 14,052.50 <br /> Path Construction Outside of Development 6,450.00 <br /> Tourville service construction 1.175.00 <br /> Total estimated Base Construction Cost $372 <br /> Overhead costs (38 %) <br /> Engineering 8.0% <br /> Legal 1.0% <br /> Construction Administration 3.0% <br /> Inspection and Staking 7.0% <br /> Bonding and Finance 5.0% <br /> Plan/Plat Review 2.0% <br /> Easements 1.0% <br /> Assessments 1.0% <br /> Contingencies 10.0% <br /> Total Estimated Overhead Costs $141,485.40 <br /> Total Estimated Project Cost $513,815.40 <br /> Watermain Alternative 1 $38,176.25 <br /> Overhead costs (38%) $14.506.98 <br /> Alt 1 Project Cost $52,683.23 <br /> Watermain Alternative 2 $11,187.50 <br /> Overhead costs (38 %) $4.251.25 <br /> Alt 2 Project Cost $15,438.75 <br /> FEAS- 260.089 5 <br /> 260089m <br />