Laserfiche WebLink
i <br /> b <br /> r` • LJMS Howard R. Green Company <br /> Formerly CONSULTING ENGINEERS MSA <br /> Formerly MSA <br /> January 21, 1998 consulting Englneere <br /> File: 260077m <br /> Mr. Jim March <br /> City Administrator <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038 <br /> RE: CLEARWATER MEADOWS COST ANALYSIS <br /> Dear Mr. March: <br /> In response to your request, we are providing you information on a cost analysis for the <br /> Clearwater Meadows project. We understand that the Developer has requested an analysis of <br /> the total project cost to request an adjustment of his assessment as necessary to reimburse him <br /> for any cost due at this time, now that the development is complete. <br /> PROJECT COST <br /> The total cost of the project is listed below, not including any City administration or legal fees. <br /> The project has been finalized. We have a signed final pay estimate from the Contractor. <br /> Grading Plan and Plat Review $ 4,617.44 <br /> Feasibility Study 4,415.87 <br /> Plans and Specifications 20,001.24 <br /> Assessments 1,693.62 <br /> Construction Administration 15,520.31 <br /> Grading Plan Issues 2856.19 <br /> Field Services (inspection and staking) 31.677.90 <br /> Sub -total (actual overhead, 22.15 %) $80,782.57 <br /> Construction $364,705.48 <br /> Total Project Cost $445,488.05 <br /> CITY IMPROVEMENTS <br /> Below is a summary of the costs that could be itemized as a separate City expense from the <br /> Developer's cost for Clearwater Meadows. The overhead totals shown are in direct proportion <br /> to the total overhead based on a percentage of the total construction cost. <br /> 1326 Energy Park Drive • St. Paul, MN 55108 • 612/644 -4389 fax 6121644 -9446 toll free 888/368 -4389 <br />