My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-12-21 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-12-21 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2011 3:44:47 PM
Creation date
8/22/2011 3:44:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stop sign at Main and 20th Avenue. <br /> Mr. Peterson addressed the grading and utility plan, and suggested moving C.B.5 6 -feet south, <br /> so that the pipe from C.B. 5 to C.B. 3 stays within the right -of -way and to show the defined <br /> emergency overflow swale between lots 17 -18 from the low point catch basins to the pond. (Set <br /> E.O.F. at elevation 906.5). Mr. Peterson elaborated on the Comprehensive Water Main Plan that <br /> shows an existing 10 -inch main on Brain Drive. Continuing, the plans will need to show a new <br /> 10 -inch main on Brain Drive and along Eagle Trail and extend the10 -inch main from Eagle Trail <br /> to C.R. 54 (20th Avenue South) and connect the 10 -inch main to The existing 12 -inch main on <br /> 20th Avenue, <br /> Mr. Lessard requested the City pay the pipe oversizing cost. <br /> The Council discussed trailways and its liability and whether or not to pave the trail that connects <br /> the Center Villa development to 20th Avenue. Mr. Peterson commented that the width of the <br /> Floodway is under investigation. Mr. Palzer noted that the existing business property parcel <br /> (Lake Area Utilities) cannot be split because it is in the floodway. Mr. Lessard replied that they <br /> are investigating lot split possibilities, however, he would rather assume that liability. <br /> Ms. Chris Swenson (7016 Brian Court) expressed concerns about the tree line being removed and <br /> requested that it remain on the property. <br /> Mr. Wayne LaBlanc (1677 Peltier Lake Drive) noted he confirmed the drainage direction of the <br /> pond. <br /> Mr. March reported the Planning and Zoning Commission was favorable to granting variances for <br /> the butt lots because the lots greatly exceeded the minimal lot size. Mr. Peterson said Brain Drive <br /> street will taper down to match the Eagle Trail width. <br /> Councilmember Brenner felt that prior to Council action, the Council should consider the <br /> neighbors concerns, and that there is no data to support eliminating the collector street from the <br /> comprehensive plan. Mayor Wilharber said the neighbors concerns are valid, the developer has <br /> been in several times and questioned why now is the City proposing additional commercial <br /> property to develop. <br /> Councilmember Buckbee moved to approve the preliminary plat for Center Villa <br /> contingent upon RCWD and that outlot one is commercial property Mayor Wilharber <br /> seconded the motion. <br /> Councilmember Brenner stated a few concerns she felt the Council should consider. Foremost, <br /> the Council has not had ample time to review the Planning and Zoning Meeting minutes. There is <br /> no reason or supporting documentation to eliminate the collector street, and trails should be <br /> established during construction. Ms. Brenner thanked Mr. Lessard as she enjoyed the pleasure of <br /> working with him. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.