Laserfiche WebLink
PARTIAL PAN LENT ESTUTATE <br /> NO. 2 <br /> FROM: SEPTEMBER 17, 1998 <br /> TO: OCTOBER 21, 1998 <br /> CONTRACTOR: BONINE EXCAVATING, INC. <br /> ADDRESS: 12669 MEADOW VALE ROAD, ELK RIVER, MINNESOTA, MN 53330 <br /> OWNER: CITY OF CENTERVILLE, MINNESOTA <br /> PROJECT: PARKVIEW ADDITION STREET, STORM SEWER, SANITARY SEWER <br /> AND WATERMAIN IMPROVEMENTS (260089M) <br /> COMPLETION DATE AMOUNT OF CONTRACT: <br /> ORIGINAL: OCTOBER 17. 1998 ORIGINAL: 5444,279.00 <br /> REVISED: REVISED: <br /> ; CgaS'Ck [1TkNS ,3,3ISSRR'R1O<K `i AEY£i13.7O Ah'E <br /> 3TEbS <br /> 1:TO 411P5LTi$YfiOK.� FiN$R `. QI'Y., GIBFY Q2V< ffiFTtiE3X?r .0 ,AAT(i�RS'1`. <br /> SCDEDID 1..10 SITRWORK <br /> 1 SALVAGE TOPSOIL (CV) CY 400 $3.50 0.00 5090 0.00 $0,00 <br /> 2 TOPSOIL BORROW (CV) CY 400 56.00 0.00 50.00 0.00 50.00 <br /> 3 SEEDING AC 0.5 5450.00 0.00 50.00 0.00 50.00 <br /> 4 MULCHING AC 0.5 $105.00 0.00 $0.00 0.00 50.00 <br /> 5 SODDING $Y 35M $2.00 0.00 $0.00 0.00 $0.00 <br /> 6 SILT FENCE LT 2000 $2.00 0.00 50.00 0.00 $0.00 <br /> 7 FOUNDATION REMOVAL LS I 5650.00 0.50 $325.00 0,50 $325.00 <br /> T SCHEDULEI.O SITFWORK- TOTAL $325.00 5325.00 <br /> SCHEDULE 2 B STREET CONSTRUCTION <br /> 1 REMOVE BITUMINOUS DRIVEWAY SY 150 $2.50 0.00 50.00 0.00 SOAO <br /> 2 SALVAGE DRIVEWAY AGGREGATE CY 7 $5.00 0.00 $0.00 0.00 SO.00 <br /> 3 SUBGRADE PREPARATION RD STA 22 $150.00 22.00 $3.300.00 22.00 $3.300.00 <br /> 4 MODIFIED SELECT GRANULAR BORROW (P) CY 6000 $8.50 6,000.00 551000.00 6,OOD.00 $51,000.00 <br /> 5 GEOTEXTILE FABRIC SY 10300 $1.00 9,000.00 $9,000.00 9 $9.000.00 <br /> 6 MILL BITUMINOUS PAVEMENT SY 30 512.00 0.00 50.00 0.00 50.00 <br /> 7 SHOULDERING AGGREGATE. CLASS 2 TON 10 S2D.00 0.00 50.00 0 m 50.00 <br /> 8 AGGREGATE BASE, CLASS S TON 3175 58.50 2.000 cc 517,000.00 2,000.00 $17,000.00 <br /> 9 TYPE 4IA WEAR COURSE MIXTURE TON 775 $31,00 0.00 50.00 0.00 50.00 <br /> 10 TYPE 3111, BASE COURSE MIXTURE TON 775 $30.00 0,00 50.00 0.00 $0.00 <br /> I I BITUMINOUS MATERIAL FOR TACK COAT GAL 400 $1.10 0.00 $0.00 ODD 50.00 <br /> 12 CONCRETE CURB& GUTTER, SURMOUNTABLE LF 4385 $6.50 4,386.00 $28,509.00 4,386.00 $28309.00 <br /> 13 BITUMINOUS DRIVEWAY RESTORATION SY 115 510.00 0.00 $0.00 0.00 SOHO <br /> 14 4' CONCRETE SIDEWALK SF 5300 $2.00 0.00 $0.00 0.00 $0.00 <br /> IS SUBGRADE DENSITY TEST, INPLACE EA 20 $40.00 0.00 30.00 0.00 $0.00 <br /> 16 CLASS 5 GRADATION TEST EA 2 565.00 0.00 50.00 0.00 $0.00 <br /> 17 CLASS S PROCTOR TEST EA 2 $85.00 0.00 50.00 0.00 $0,00 <br /> TS CLASS 5 DENSITY TEST, INPLACE EA 10 $40.00 0.00 $0.00 0.00 $0.00 <br /> 19 CONCRETE TESTING EA 7 $135.00 0.00 50.00 0.00 $0.00 <br /> 20 BITUMINOUS CORE DENSITY TESTING EA 6 $350.00 0.00 5090 0.00 50.00 <br /> T SCHEDULE 2.0 STREET CONSTRUCTION -TOTAL $108,809.00 $108.809.00 <br /> o:lprojU60089 #2 PAGE I <br />