My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-10-28 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-10-28 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 7:57:47 AM
Creation date
8/23/2011 7:33:53 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . . . . ....... <br /> grDIEDULF. 10 BITUMINOUS TIZAIT, CONSTRUCTI <br /> I SUBGRADE PREPARATION RD STA 4 $180.00 0.00 SOM 0.00 $0.00 <br /> 2 AGGREGATE BASE, CLASS 5 TON 175 $9.50 0.00 50.00 om $0.00 <br /> 3 TYPE 41 BIT MIXTURE FOR PATHS TON 43 $35.00 0.00 50.00 0.00 MOD <br /> T SCHEDULE 3.0 BITUMINOUS TRAIL CONSTRUCTION - TOTAL sow 50.00 <br /> SCHEMIq E 4 0 STORM SEWER CONSTRITLI70 <br /> I REMOVE 12* CM? LF 40 55.50 0.00 $0.00 0.00 $0.00 <br /> 2 15' CMP LF 85 $15.60 46.00 $717.60 46.00 $717.60 <br /> 3 15' RCP, CL V LF 250 $20.15 192.00 $3,868.80 IK.m $3,868.80 <br /> 4 IS' RCP. CL III LF 35 $22.00 197.00 84,334.00 Iw.00 54,334.00 <br /> 5 21" RCP, CL III LF 365 $24.30 354.00 $8,673.00 354.00 $8.673.00 <br /> 6 24' RCP, CL Ul LF 240 $26.60 206.00 $5.419.60 206.00 S5,479.60 <br /> 7 30' RCP, CL III LF 350 $37.40 0.00 Somoo om $0.00 <br /> 8 24 X 36 CATCH BASIN EA 7 $850.00 &W 56.800.00 8mm 56.800m00 <br /> 9 STANDARD STORM MANHOLE EA 3 51.130M 3.00 53,3%.W 3.00 $3,390.00 <br /> 10 34" DIAMETER STORM MANHOLE EA 2 $1,665.00 2.OD $3,330.00 2.00 $3.330.00 <br /> 11 24m RCP APRON W1 TRASH GUARD EA 1 $675,00 2.00 susom 2.00 $1,350.00 <br /> 12 30" RCP APRON W/ TRASH GUAM EA 3 $995.00 0.00 $0.00 Boo $0.00 <br /> 13 15' RCP SAFETY APRON FA 2 $615.00 2m00 $1,230.00 2.00 $1,230.00 <br /> 14 RIP RAP, CL III TON 6 $50.00 0.00 som 0.00 $0.00 <br /> 15 20; 1 STORM SEWER SUBGRADE TAPER LF 200 $6.00 0.00 50.00 0.00 $0.00 <br /> 16 CONCRETE CATCH BASIN COLLAR EA 7 $70.00 0.00 SOM 0,00 $0.00 <br /> 17 CONCRETE MANHOLE COLLAR EA 5 $70.00 om 50.00 0.00 50.00 <br /> 18 STANDARD PROCTOR EA 3 $95.00 omm Sow OM $0.00 <br /> 19 INmPLACF. DENSITY RA 15 $40,00 0.00 Somw omoo $0.00 <br /> T SCHEDULE 4.0 STORM SEWER CONSTRUCTION TOTAL 539.173.00 $39,173m00 <br /> SCHEDITLE 9.0 WATERMAIN CONSTRUCTIDN <br /> I CONNECT TO EXISTING WATERMAIN EA 1 $320m 1.00 $320.00 I. Do S320. DD <br /> 1 6' PVC WATERMAIN LF 460 $14.20 15.00 5213.00 455.00 $6,461.00 <br /> 2 8' PVC WATERMAIN LF 1980 516.20 64.00 $1.036.90 1.964.00 $31,816.80 <br /> 3 12' PVC WATERMAIN LF 965 $24.50 956m00 $23.42100 956.W $23,422.00 <br /> 4 FTIMNG5 LBS 4500 $1.70 4.415.00 $7.505.50 4,915.00 $8,355.50 <br /> 5 HYDRANT W/ GV EA 5 52.000.00 0.00 Sow 5.00 sio,womoo <br /> 6 6m DATE VALVE EA I $425.00 1.00 $425.00 100 $850.00 <br /> 7 S' GATE VALVE EA 8 $570.00 3.W SI-710m 7.00 <br /> 8 12' VALVE EA 2 $760.00 1.00 5760.00 1.00 $760.00 <br /> 9 VALVE ROD EXTENSION EA 11 $95.00 0.00 50.00 0,00 $0.00 <br /> 10 1" SERVICE CONNECTION W/ CURB STOP EA 48 5150.00 ISM 52,700.00 39.00 $5.700.00 <br /> 11 1' COPPER SERVICE PIPE LF 1095 $5.30 940.00 $4.982.00 IM0.00 $7,632.00 <br /> 12 DIRECTIONAL BORE I' COPPER SERVICE PIPE LF 400 $25.00 loomm $2,500.00 100.00 $2,500.00 <br /> 13 JACKmBORF, I8' STEEL CASING PIPE LF so $125.00 MOG 515,000M 120.00 $15.000.00 <br /> 14 GRANULAR FOUNDATION MATERIAL CY 600 50.01 0.00 $0.00 100.00 $1.00 <br /> 15 GRANULAR BEDDING MATERIAL CY 600 $0,01 0.00 $0.00 0.00 Sow <br /> 16 STANDARD PROCTOR EA 3 $85m 0.00 $0.00 2.00 $370.00 <br /> 17 IN-PLACE DENSITY EA 20 S40M omoo SOMDO 5.00 $200.00 <br /> T SCHEDULE 5.0 WATERMAIN CONSTRUCTION TOTAL 560374.30 $117.179.30 <br /> oAprojU60089#2 PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.