BID TABULATION
<br /> PROJECT: LAURIE LAMOTTE MEMORIAL PARK (260094M)
<br /> OWNER, CITY OF CENTERVILLE. MINNESOTA
<br /> OPENING DATE: AUGUST 25, 1998
<br /> ENGINEER: HOWARD R. GREEN COMPANY
<br /> SYE65 s A'TEAl ORSC'BAPTIDSf{ s r i FTN1E&'A'SdKM, fpF4'Jiir � � tS9 i ..OLRNNAEISBFlN SX(<'1= z _ (y1k>W+tNRNU1LS5.kIPH iz .
<br /> `� PRICS TATh>.PRtCG:, ��t +Tbru.PacB
<br /> ScIlmi1F I O CRAOINC FROS,10NrON '
<br /> I MOBILIZATION IS 1 $7,000.00 $7,OW.W $25,000.00 525,000.00 $19,000.00 519,000.00 $72,144.90 572,144.W
<br /> 2 COMMON EXCAVATION IS 1 $45,0W.W I45,OW.00 $60,000.00 160,000.00 $66,IW.00 566,10100 163.000.00 S3,OW.W
<br /> 3 MUCK EXCAVATION(EV) CY IOW 52.00 $2,000.00 $4.W 14,000.00 $2.75 123M.00 $1.00 18.000.00
<br /> 4 CLEAR &GRUB AC 0.5 $3,8W.W $1,900.W $6.000.00 53.000.00 14,000.0) $2,000.00 51,000.00 1500.00
<br /> 5 REMOVE EXISTING BITUMINOUS SURFACE(?) SY 216 $2.00 M32.00 $3.50 5756.00 $2 .70 $583.20 53.00 $WB.W
<br /> 6 REMOVE EXISTING CONCRETE SIDEWALK (P) SY 19 14.00 $76.00 54.m $76.00 54.00 $76.W 120.0) $381100
<br /> 7 REMOVE EXISTING CULVERTS EA 2 $300.00 $600.00 5150.00 $3W.00 SI00.W $200.00 1310.00 $620.00
<br /> 8 REMOVE It SALVAGE EXISTING AGGREGATE (P) CY 314 $4.8S $1,522.90 $4.W $1,256.00 $6.50 $2,0U.W $4.00 $1,256.W
<br /> 9 REMOVE& SALVAGE EXISTING LIME AGGREGATE( CY 184 $2.50 $4W.00 $4.00 $136.00 $2.50 $4W.W $5.50 $1,012.00
<br /> 10 SILT FENCE LF 12M $).75 $2,IW.0D $2.00 $2,400.00 12.50 53,000.00 $4.00 $4,800,00
<br /> II BALE CHECKS EA 45 $5.00 $225.00 $7.00 $315.00 M2.00 $540.00 $266.00 $11,970.00
<br /> 12 TIMBER CHECK DAMS EA 9 1300.00 12,700.00 11,000.00 $9,000.00 5150.00 $1,350.00 $2,000.00 $18,000.00
<br /> 13 TEMPORARY ROCK CONSTRUCTION ENTRANCE (P) SY 45 $7.00 $315.00 $IB.W $810.00 $20.00 $900.00 114.00 $630.00
<br /> 14 RIPRAP (CLASS III ) CY 8 $65,W 1520.00 $100.00 SEW.W $42.00 936.00 168.00 $544.00
<br /> T SCIIEDUIE 1.0 GRADING A, EROSION CONTROL -TOTAL $64,550.90 $108,449.00 $99.39.20 $123,5W.W
<br /> SCHEnID E 2.0 PARKING AREA 154PRGVFMFNTC
<br /> 1 MODIFIED SELECT GRANULAR BORROW (P) CY 3530 $9.25 $32,652.50 $7.30 526,475.0) SIO.30 $36,359.00 $18.00 $63,540.00
<br /> 2 CUSS 5 AGGREGATE BASE TN 1805 $6.00 $10,130.00 $9.00 116,245.00 $8.45 $15,252.25 $27.00 $48.735.00
<br /> 3 ADJUST SANITARY SEWER CLEANOUT COVERS EA 3 1130.00 1390.00 $150.00 $450.00 $150.00 $4SD.00 5600.00 5LIJW.W
<br /> 4 PERFORATED THERMOPLASTIC DRAIN PIPE
<br /> 4 WITH TYPE I GEOTEXTILE SOCK LF 1500 $3.25 $4,875.00 $6.50 59,750.00 JILTS $2,615.W $1.00 $12,000.00
<br /> 5 4' THERMOPLASTIC GRAIN PIPE IF 750 $3.25 $2,437.50 $6.00 M -5W.00 $3.00 $2,250.W S1I.W 3$80.00
<br /> T SCHEDULE 2.0 PARKING AREA IMPROVE6IENTS -TOTAL $51,185.00 157,42100 556,936.25 $134,325.00