<br /> SCHEDLI F 3_0 TURF F_STA R11SI f61 ENT
<br /> 1 SEEDING(ATHLEfIC TURF MIX) (P) AC 4.3 $2.400.0) $10,320.00 $1,100.00 $4,730.00 $2,800.W $12,040.0) $3,363.00 $14460.90
<br /> 2 SEEDING AC 11.6 $1,700.00 $19,720.00 SS50.00 $6,380.0) $8W.00 $9,280.00 $2,394.00 $27,770.40
<br /> 3 TYPE 5 WOOD CELLULOS E MU LCI I(ATH LETIC FIELD AC 4.3 56X).0) $2,580.0) $600.W $2,580.00 $750.00 $3,225.0) $318.00 $1,367.40
<br /> 4 MULCHING AC 11.6 $170.00 31,972.00 $400.0) $4,640.00 360).00 $6,960.00 5334.00 $3,874.40
<br /> 5 WOOD FIBER BLANKET s 20)0 SI.3U $200.00 $1.05 $2,I0D.00 $1.65 $3,300.00 SS.W $10,0W.W
<br /> T SCHEDULE 3.0 TURF ESTABLISI NI ENT -TOTAL $37,192.00 $20,430.00 $34.805.00 557,473.10
<br /> BID SUMMARY
<br /> SCHEDULE 1.0 GRADING B EROSION CONTROL - TOTAL 564,850.90 $108,449.00 $99,336.20 $123,$01.90
<br /> SCHEDULE 2.0 PARKING AREA IMPROVEMENTS -TOTAL $51,185.0) $57,420.00 $56,936.25
<br /> M54,325.10
<br /> SCHEDULE 3.0 TURF ESTAELISHMENT - TOTAL S3],192.0) $20,410.0) 534,805.0) 55],4]3.10
<br /> TOTAL BASE BID $153,227.90 5186,299.00 S191,0]7.45 S315.M3.00
<br /> 1 REMOVE EXCESS SOIL FROM SITE LS 1 $I3,X)O.X) $13,(X0.0) $1000).00 $10,000.00 S12.5W.W S12.5W.W $3,175.00 53,17S.W
<br /> T BIDAL7ERNATEA REBIOVAL OF EXCESS SOIL FROM SITE - TOTAL S13,6W.00 $10,000.00 $12,50).00 $3.175.00
<br /> HOCKEY RANK IMPROVEMENTS
<br /> 1 SUBGRADE EXCAVATION FOR RINK (P) CY 708 SLm $1,132.80 S].W $4,956.W $235 $1,593.00 $6.00 $4.24B.00
<br /> 2 MODIFIED SELECT GRANULAR BORROW (P) CY 600 51 I.0) $6,6X).00 $8.50 $5,1W.W $17.35 $10,410.03 $11.00 $6,600.W
<br /> 4' PERFORATED THERMOPLASTIC DRAIN PIPE
<br /> 3 WITH TYPE I GEOTEXTILE SOCK LF 526 $3.75 51,972.50 $6.50 $3,419.00 $2.35 51,23610 $6.50 $3,419.00
<br /> 4 4' THERMOPLASTIC DRAIN PIPE LF W 53.75 $225.W $6.0) $360.W $S.0) $m.X) $7,0) S420.W
<br /> Y THICK. 40 PSI TONGUE & GROOVE EXTRUDED
<br /> 5 POLYSTYRENE INSULATION BOARD (P) SF 1620) $I.0) 516,20),00 $1.75 $28,350.00 $1.05 $17.010.W $2.00 S32,400.W
<br /> 6 INSTALL HOCKEY RINK BOARD POSTS IS 1 $2.600.00 $2,60).00 $4,0)3.0) S4.".W S7,130.W !7,130.00 $29,750.00 520,750.00
<br /> 7 REMOVE& INSTALL PENALTY BOXES LS I SI6,OW.W $10,00).00 SI,500.00 $1,500.00 $7,250.W $7,250.W S2,975.W $2,875.W
<br /> n: %pmj1260094m @600946! PAGE 7 +arp4