Laserfiche WebLink
BONESTR00 ROSENE ANDERLIK 6516361311 09/17/98 10:07 [J :02/05 NO:152 <br /> tfDnl6lfn0, XOSnne, Anx(�k andA w la I r.. > aI Altl n r v. A'f �,'hQ r 19pnwhaYty t ^pr ^fr• <br /> Bo nestroo Pr,,;q,,A Pr,,; ,, Ocy&G Roner rou PY Jwpc ' Alllilfik Pf M B. <br /> w A RICMnrd F h ro Pr. • GI ry R. Cew PC P o "I D f:r +m nt. P1 br , A. QawJ o, PL. • <br /> Rosne ROCMt W Rosena, RF- m S +d %r , M lbv�b CPA.. Sr +•, G t dr'u n <br /> An GG � rlik & As "fare OnndoNs. fbward A. Sanfnm. PF Yn In A Gmacr, 1 f • R.MM IR rretrvnn. MF • <br /> Fu'M'd W f01CUr fR. r Unv a O L01Mr tJ. f Ar pl r C R n eu A.1A. • MaJ A. Manson, PC <br /> Mlrhral T Rammann, R! W K NIO, Pt K n rt1 f A, I PC. • M R. Rolt3, Pe. <br /> A ssociates err '' ^pIP W`I Im PF{ ii • Rnnrrrf unrrm rh AJ . +M P ) • M,Ctlarl N3u. PF <br /> Engineers A Architects C)MCOS St PRd,flMr'h"rer. W"m mN:l.11u,a. MN • M,1V 11-,'1 <br /> Wro>IM: wwwhaneitru�.POm <br /> WEEK IN REVIEW <br /> ENGINEERING ISSUES <br /> CITY OF CENTERVILLE <br /> September 4 to September 18, 1998 <br /> BRA File No. 616 -GEN <br /> PROJECTS IN CONSTRUCTION <br /> LAMOTTE PARK <br /> Forest Lake Contracting has begun the grading operations as of September 1 I . Water main (6" <br /> PVC) was installed by City forces from Centerville Road to Lamotte Drive, Currently we have <br /> been attempting to make contact with Lino Lakes to get their approval on a modification of the <br /> designed drainage patterns. The goal Is to intercept the drainage along the east Aide of the park <br /> building and hockey rink with concrete stood sewer and outlet the water westerly in the drainage <br /> ditch which separates the cities. See attached sketch for details. <br /> Currently we are seeking estimates for the abandonment of the well. Electrical quotes will be <br /> obtained for rewiring the building and hockey lights. <br /> CLEARWATER MEADOWS <br /> No new issues to report on this project. <br /> EAGLE PASS <br /> The park pathway was paved last week. Paul, Jim, and Eric met with the developer to discuss the <br /> following issues: <br /> Street sweeping -which will be completed this week <br /> Park costs to date -the developer will be submitting the incurred costs to date. <br /> Restoration along the path and play structure• will be taking place in the next couple of <br /> weeks <br /> LAKELAND HILLS <br /> No new issues to report on this project. <br /> 2335 West Highway 36 ■ St. Paul, MN 55113 9 612-636-4600 • Fax: 612.636-1311 <br />