My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-09-23 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1998
>
1998-09-23 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 1:44:22 PM
Creation date
8/23/2011 1:44:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BONESTR00 ROSENE ANDERLIK F 6516361311 09/17/98 10:07 l3 :03/05 NO:152 <br /> THE WOODS OF CLEARWATER CREEK <br /> The contractor, Glenn Rehbein Companies, has begun the installation of the utilities this week. <br /> The plan is to finish sanitary sewer, water main, storm sewer, and house services within the <br /> roadway before installing the water main loop to the west. It is anticipated that loop water main <br /> installation will begin September 18 or September 21, Comments and corrections to the HR <br /> Green construction plan were made and submitted. Signed plans have not been received yet. <br /> BUECHLER ESTATES <br /> No new issues to report. <br /> FLASHING CROSSWALK LIGHTS ON CSAH 14 <br /> Anoka County has been contacted and maps am being obtained to design the lights, Inspection <br /> will be by Bonestroo, with periodic checks by the County. <br /> CENTER VILLA <br /> A meeting was held on Tuesday, September 15 with Mr. Lessard, Charles Plowe (engineer), <br /> Matt Davich (EG Rud), and Jim March, Their preliminary plat was reviewed, with several <br /> comments and questions answered. Mr. Lessard plans to start grading September 24 and <br /> complete Phase I (west half of plat), this season. Drainage will be directed to the east through a <br /> series of ponds, wetlands, and ditches. <br /> 21" AVENUE ROAD CONSTRUCTION <br /> John Powell, Lino Lakes engineer, has indicated their desire to proceed with 21" Avenue this <br /> year. A set of preliminary plans was received on September 17. Bids are proposed to he opened <br /> October 21, I998. I will be reviewing their plans this week and submitting comments or <br /> concerns. <br />
The URL can be used to link to this page
Your browser does not support the video tag.