Laserfiche WebLink
44 98 11: � :03/05 N0:903 <br /> SONESTROO ROSENE ANDERLIK 6516361311 091041 - -�+■*w <br /> THE WOODS OF CLEARWATER CREEK <br /> We have inspected the grading and walked the attirc site with Dick Travis of Glenn Robbein <br /> Companies, Comments were made regarding softening the street curves at the entrance to the <br /> subdivision, increasing the size of the turnaround, and extending the storm sewer pipes to match <br /> the new pond configuration. We felt it was a very good Idea to utilize the existing ditch in the <br /> City's park. <br /> Regarding the water main looping to Revoir 9tteet, it is our recommendation to install the pipe at <br /> this time. Without it, there would be a 1000' dead end line on Brian Drive and a 1700' long dead <br /> end line on Revoir /Old Mill Road, The developer has agreed to extend the 8" diameter main to <br /> the west property line at their expense. This leaves approximately 340' along the north property <br /> line of the park that the City would be responsible for, The estimated cost, including design and <br /> inspection, is 1;6,000. <br /> BUECHLER ESTATES <br /> Eric Johnson and Tom Peterson inspected the site on Friday, August 28, 1998. Developed <br /> several comments regarding the plat. These comments along with Paul Palzer's comments were <br /> discussed at the Planning and Zoning meeting on Wednesday, September I ". The comments are <br /> attached to this memo for your infomtation. <br /> E,G. Rud has since made corrections to the plat drawing and resubmitted a revised preliminary <br /> plat. The overall condition of Mound Trail needs to be discussed further. The developer has <br /> indicated some willingness to participate in reconstructing the street, but an agreement needs to <br /> be worked out. Soil borings will be taken to determine the extend of work necessary. <br />