My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-01-08 - CC Packet - (Admin.)
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-01-08 - CC Packet - (Admin.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2011 3:38:26 PM
Creation date
8/23/2011 3:38:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-Page 2- <br /> Sanitary Sewer and Municipal Water. Sanitary sewer is readily available to <br /> this land and will be extended into the subdivision from both the south and <br /> north. Municipal water will be extended from the Centerville Road and <br /> Westview Street intersection. The need to further loop the water main will be <br /> determined by the City engineer. If and when a loop is required, two possible <br /> ways to provide that loop exist, One is to the east connecting to the water <br /> main in Clear Ridge Street. The other loop possibility is to the north in <br /> Centerville Road and then east along Peltier Lake Drive to the water main in <br /> Mill Road. The pro's and con's and constraints with these two alternatives <br /> will be discussed through the review and approval process. <br /> Restrictive Covenants and Home Values. A copy of the proposed restrictive <br /> covenants and architectural review committee are attached for City review, It <br /> is our anticipation that new homes will be constructed in a price range of <br /> $170,000 to $220,000, including lot. <br /> Our Company looks forward to working with the Planning Commission and <br /> City Council for the approval of Lakeland Hills. It is our intention to begin <br /> construction in early spring, 1997. All grading, utility and street construction <br /> would be done in one phase. We anticipate the completion of all homes by the <br /> summer of 1999. <br /> Yours truly, <br /> Michael 7, Black <br /> Project Manager <br /> Land Development Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.