Laserfiche WebLink
20th Avenue Watermain Interconnection <br /> & Trunk Sanitary Sewer <br /> City of Centerville <br /> Alternative No. 2 <br /> Sanitary Sewer Only Based on $$ /Area <br /> Construction Costs <br /> Restoration 27,500.00 <br /> Sanitary Sewer Construction 161,100.00 <br /> Total Construction Cost $ 188,600.00 <br /> Overhead Costs Percent <br /> Adminstration 1.00% 1,886.00 <br /> Engineering 7.50% 14,145.00 <br /> Legal 1.50% 2,829.00 <br /> Construction Adminstration 2.00% 3,772.00 <br /> Inspection 7.00% 13,202.00 <br /> Staking 2.00% 3,772.00 <br /> Bonding and Finance 4.00% 7,544.00 <br /> Contingencies 10.00% 18,860.00 <br /> Total Overhead Cost $ 66,010.00 <br /> Total Project Cost $ 254,610.00 <br /> Assessments <br /> Properties Assessment Table Area AC Description $Z355 <br /> West of 20th Avenue <br /> Clearwater Meadows Outlot 4.7 Commercial <br /> Lake Area Utilities 17.6 Commercial - <br /> Kenko 2.9 Commercial 6,829.50 <br /> Kenko 1.7 Commercial 4,003.50 <br /> Carpenter 5.0 Commercial 11,775.00 <br /> Reel Manufacturing 3.6 Commercial 8,478.00 <br /> Rehbein Inc 6.6 Commercial 15,543.00 <br /> Rehbein Inc 6.6 Commercial 15,543.00 <br /> Rehbeing Inc 12 Commercial 2,826.00 <br /> East of 20th Avenue <br /> Sheehy 18.1 Industrial - <br /> Herman Strelow 21.1 Industrial 49,690.50 <br /> Joyce Stevens 21.1 Industrial 49,690.50 <br /> Gerald Rehbein 38.4 Industrial 90,432.00 <br /> Total Properties Assessment $ 254,811.00 <br /> Total City's Cost $ - <br /> Total Assement $ 254,811.00 <br /> Total Project Cost $ 254,610.00 <br />