Laserfiche WebLink
20th Avenue Watermain Interconnection <br /> & Trunk Sanitary Sewer <br /> City of Centerville <br /> Alternative No, 3 <br /> Watermain Only Based on $$IFF <br /> Construction Costs <br /> Restoration 27,500.00 <br /> Watermain Construction 247,000.00 <br /> Total Construction Cost $ 274,500.00 <br /> Overhead Costs Percent <br /> Adminstration 1.00% 2,745.00 <br /> Engineering 7.50% 20,587.50 <br /> Legal 1.50% 4,117.50 <br /> Construction Adminstration 2.00% 5,490.00 <br /> Inspection 7.00% 19,215.00 <br /> Staking 2.00% 5,490.00 <br /> Bonding and Finance 4.00% 10,980.00 <br /> Contingencies 10.00% 27,450.00 <br /> Total Overhead Cost $ 96,075.00 <br /> Total Project Cost $ 370,575.00 <br /> Assessments <br /> Properties Assessment Table FF Description 41.55 <br /> West of 20th Avenue <br /> Clearwater Meadows Outlot 690 Commercial 28,669.50 <br /> Lake Area Utilities 650 Commercial 27,007.50 <br /> Kenko 350 Commercial 14,542.50 <br /> Kenko 220 Commercial 9,141.00 <br /> Carpenter 320 Commercial 13,296.00 <br /> Reel Manufacturing 340 Commercial 14,127.00 <br /> Rehbein Inc 380 Commercial 15,789.00 <br /> Rehbein Inc 100 Commercial 4,155.00 <br /> Rehbeing Inc 160 Commercial 6,648.00 <br /> East of 20th Avenue <br /> Sheehy 650 Industrial 27, 007.50 <br /> Herman Strelow 675 Industrial 28,046.25 <br /> Joyce Stevens 675 Industrial 28,046.25 <br /> Gerald Rehbein 1350 Industrial 56,092.50 <br /> Total Properties Assessment $ 272,568.00 <br /> Total City's Cost (WM Oversizing & Metering Vault) $ 98,300.00 <br /> Total Assement $ 370,868.00 <br /> Total Project Cost $ 370,575.00 <br />