Laserfiche WebLink
20th Avenue Watermain Interconnection <br /> & Trunk Sanitary Sewer <br /> City of Centerville <br /> Alternative No. 4 <br /> Watermain Only Based on $$ /Area <br /> Construction Costs <br /> Restoration 27,500.00 <br /> Watermain Construction 247,000.00 <br /> Total Construction Cost $ 274,500.00 <br /> Overhead Costs Percent <br /> Adminstration 1.00% 2,745.00 <br /> Engineering 7.50% 20,587.50 <br /> Legal 1.50% 4,117.50 <br /> Construction Adminstration 2.00% 5,490.00 <br /> Inspection 7.00% 19,215.00 <br /> Staking 2.00% 5,490.00 <br /> Bonding and Finance 4.00% 10,980.00 <br /> Contingencies 10.00% 27,450.00 <br /> Total Overhead Cost $ 96,075.00 <br /> Total Project Cost $ 370,575.00 <br /> Assessme is <br /> Properties Assessment Table Area AC Description C& $1,835 <br /> West of 20th Avenue <br /> Clearwater Meadows Outlot 4.7 Commercial 8,624.50 <br /> Lake Area Utilities 17.6 Commercial 32,296.00 <br /> Kenko 2.9 Commercial 5,321.50 <br /> Kenko 1.7 Commercial 3,119.50 <br /> Carpenter 5.0 Commercial 9,175.00 <br /> Reel Manufacturing 3.6 Commercial 6,606.00 <br /> Rehbein Inc 6.6 Commercial 12,111.00 <br /> Rehbein Inc 6.6 Commercial 12,111.00 <br /> Rehbeing Inc 1.2 Commercial 2,202.00 <br /> East of 20th Avenue <br /> Sheehy 18.1 Industrial 33,213.50 <br /> Herman Strelow 21.1 Industrial 38,718.50 <br /> Joyce Stevens 21.1 Industrial 38,718.50 <br /> Gerald Rehbein 38.4 Industrial 70,464.00 <br /> Total Properties Assessment $ 272,681.00 <br /> Total City's Cost (WM Oversizing & Metering Vault) $ 98,300.00 <br /> Total Assement $ 370,981.00 <br /> Total Project Cost $ 370,575.00 <br />