My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-06-25 - CC Packet - (Admin.)
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-06-25 - CC Packet - (Admin.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2011 3:29:23 PM
Creation date
8/26/2011 3:13:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.... .... ... ... .. . .. . .. . . <br /> N$ <br /> 12 BITUMINOUS CURB AND GUTTER LF 71 5.00 355.00 0.00 0.00 0% 0.00 0.00 0% <br /> 13 6' CONCRETE DRIVEWAY/APRON SY 12 30.00 360.00 39.00 1,170.00 325% 39.00 1,170.00 325% <br /> 14 BITUMINOUS DRIVEWAY RESTORATION SY 25 15.00 375.00 0.00 0.00 0% 0.00 0.00 0% <br /> 15 4' CONCRETE WALK SP 300 2.60 780.00 2,045.00 5,317.00 682% 2,045.00 5,317.00 682% <br /> 16 AIR VOIDS TEST EA 5 120.00 600.00 0.00 0.00 0% 0.00 0.00 0% <br /> 17 CONCRETE CYLINDER (PER SET OF 3) EA 5 40.00 200.00 0.00 0.00 0% 0.00 0.00 0% <br /> 18 GRADATION TEST EA 3 120.00 36000 0.00 0.00 0% 1.00 120.00 33% <br /> 19 PROCTOR TEST EA 1 40.00 40.00 0.00 0.00 0% 0.00 0.00 0% <br /> 20 INPLACE DENSITY TEST EA 20 30.00 600.00 0.00 0.00 0% 6.00 180.00 30% <br /> T SCHEDULE 2.0 STREET CONSTRUCTION - TOTAL 130,245.50 27,043.25 111.215,75 <br /> PERCENTAGE OF SCHEDULE 2.0 COMPLETED: 85% <br /> SCHEDULE 3-0 WATERMAIN <br /> I CONNECT TO EXISTING WATERMAIN EA 2 1,000.00 2,000.00 0.00 0.00 0% 2.00 2.000.00 100% <br /> 2 VALVE MANHOLE EA 1 1,800.00 1,600.00 0.00 0.00 0% 1.00 1,800.00 100% <br /> 3 CREEK CROSSING 'A' Ls 1 4,000.00 4,000.00 0.00 0.00 0% 1.00 4,000.00 100% <br /> 4 CREEK CROSSING *B' LS I 4,500.00 4,500.00 0.00 0.00 0% 1.00 4,500.00 100% <br /> 5 10" PVC WATERMAIN LF 1.100 15.00 16,500.00 0.00 0.00 0% 1,140.00 17.100.00 104% <br /> 6 6" PVC WATERMAIN LF 1,830 12.00 21.960.00 0.00 000 0% 1,712.00 20.544.00 94% <br /> 7 10" GATE VALVE AND BOX EA 3 650.00 1.950.00 0.00 0.00 0% 2.00 1,300.00 67% <br /> 8 6' GATE VALVE AND BOX EA 5 350.00 1.750.00 0.00 0.00 0% 5.00 I.750.00 100% <br /> 9 HYDRANT AND GATE VALVE ASSEMBLY EA 9 2,100.00 18.900.00 0.00 0.00 0% 9.00 18.900.00 100% <br /> 10 FITTINGS LB 3,015 1.00 3,015.00 0.00 0.00 0% 3,195.00 3,195-00 106% <br /> 11 WATER SERVICE CONNECT EA 31 150.00 4,650.00 0.00 0.00 0% 34.00 5,100.00 110% <br /> 12 1* COPPER SERVICE PIPE LF 1,500 7.00 10,500.00 0.00 0.00 0% 1,479.00 10,353.00 99% <br /> 13 GRANULAR FOUNDATION MATERIAL LF 2,764 0.01 27.64 0.00 0.00 0% 0.00 0.00 0% <br /> 14 PROCTOR TEST EA 1 40.00 40.00 0.00 0.00 0% 1.00 40.00 100% <br /> 15 INPLACE DENSITY TEST EA 30 30.00 900.00 0.00 0.00 0% 15.00 450.00 50% <br /> T SCHEDULE 3.0 WATERMAIN - TOTAL 92,492.64 0.00 91,032.00 <br /> PERCENTAGE OF SCHEDULE 3.0 COMPLETED: 99% <br /> nAcicricaI1260U60077#5.XLS PAGE 2 260-077-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.