My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-06-25 - CC Packet - (Admin.)
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-06-25 - CC Packet - (Admin.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2011 3:29:23 PM
Creation date
8/26/2011 3:13:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.......... <br /> xx <br /> qCHEDULE 4-0 SANIT ARY SEWER <br /> I CONNECT TO EXISTING SANITARY SEWER EA 1 900.00 900.00 0.00 0.00 0% 1.00 900.00 100% <br /> 2 CONNECT TO EXISTING SANITARY MH EA I 1,500.00 I 0.00 0.00 0% 1.00 1,500.00 100% <br /> 3 JACKBORE STEEL CASING PIPE LF 75 150.00 11,250.00 0.00 0.00 0% 75.00 11,250-00 100% <br /> 4 12' PVC SANITARY SEWER (1012') LF m 30.00 3,750.00 0.00 0.00 0% 125.00 3,750.00 100% <br /> 5 12' PVC SANITARY SEWER (12-14') LF 447 30.00 13,410.00 0 00 0.00 0% 475.00 14,250.00 106% <br /> 6 8' PVC SANITARY SEWER (08') LF 362 26.00 9,412.00 0.00 0.00 0% 719.00 18,694.00 199% <br /> 7 8' PVC SANITARY SEWER (8-10') LF 225 X00 5,850.00 0.00 0.00 0% 0.00 0.00 0% <br /> 8 8' PVC SANITARY SEWER (10-12') LF 771 26.00 20,046.00 0.00 0.00 0% 631.00 16,406.00 82% <br /> 9 8' PVC SANITARY SEWER (12-14') LF so 26.00 2,080.00 0.00 0.00 0% 0.00 0.00 0% <br /> 10 SANITARY MANHOLE (0 - 8') EA 10 1,250.00 12.500m 0.00 0.00 0% 11.00 t3,750.00 IW% <br /> 11 MANHOLE EXTRA DEPTH (> 8') LF 41 80-00 3,280.00 0.00 0.00 0% 41.57 3,325.60 101% <br /> 12 12'x4' WYE EA 8 75.00 600.00 0.00 0.00 0% 7.00 525.00 88% <br /> 13 9%4" WYE EA 23 40.00 920.00 0.00 om 0% 26.00 1 113% <br /> 14 4' SERVICE PIPE LF 1,950 6.00 11,100.00 0.00 0.00 0% 1,425.00 8.550.00 77% <br /> is GRANULAR FOUNDATION MATERIAL LF 1,810 0.01 18.10 0.00 0.00 0% 0.00 0.00 0% <br /> 16 PROCTOR TEST EA 1 40.00 40.00 0.00 0.00 0% 2.00 80.00 200% <br /> 17 INPLACE DENSITY EA 30 30.00 900.00 0.00 0.00 0% 14.00 420.00 47% <br /> T SCHEDULE 4.0 SANITARY SEWER - TOTAL 97,556.10 0.00 94,440.60 <br /> PERCENTAGE OF SCHEDULE 4.0 COMPLETED: 97% <br /> SCHEDULE 9-0 STORM SEWER <br /> 1 REMOVE 15'CMP LF 60 7.00 420.00 0.00 0.00 0% 60.00 420.00 100% <br /> 2 19" RCP STORM SEWER LF 404 32.00 12,928.00 0.00 0.00 0% 334.00 10,688.00 83% <br /> 3 18" RCP APRON EA 4 500.00 2,000.00 0.00 0.00 0% 2.00 1,000.00 50% <br /> 4 2'x3' CATCH BASIN EA 4 750.00 3.000.00 0.00 0.00 0% 4.00 3.000.00 100% <br /> 5 RIP-RAP. CL III CY 8 60.00 49000 0.00 0.00 0% 0.00 0-00 0% <br /> T SCHEDULE 5.0 STORM SEWER - TOTAL 18,828.00 0.00 15.108.00 <br /> PERCENTAGE OF SCHEDULE 3.0 COMPLETED: 80% <br /> 0clerla112601260077#5.XLS PAGE 3 26"77-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.