Laserfiche WebLink
, r <br /> TABLE 1 <br /> ASSESSMENTS FOR WATERMAIN INTERCONNECTION <br /> TOTAL PROJECT ASSESSED <br /> Assessment Assessment <br /> Area per acre' Front per FF <br /> P Type acre $ 2,423.32 Footage S 54.89 <br /> West Side of 20th Avenue <br /> Clearwater Meadows Outlot Commercial 4.7 11389.62 690 37876.98 <br /> Lake Area Utilities Commercial 17.6 42650.48 650 35681.21 <br /> Kenko "A' Commercial 2.9 7027.64 350 19212.96 <br /> Kenko "B" Commercial 1.7 4119.65 220 12076.72 <br /> Carpenter Commercial 5 12116.61 320 17566.13 <br /> Reel Manufacturing Commercial 3.6 8723.96 340 18664.02 <br /> Rehbein Inc "A" Commercial 6.6 15993.93 380 2085978 <br /> Rehbein Inc "B" Commercial 6.6 15993.93 100 5489.42 <br /> Rehbein Inc "C" Commercial 1.2 2907.99 160 8783.07 <br /> East Side of 20th Avenue <br /> Sheehy Industrial 18.1 43862.14 650 35681.21 <br /> Herman Strehlow Industrial 21.1 51132.11 675 37053.56 <br /> Joyce Stevens Industrial 21.1 51132.11 675 37053.56 <br /> Gerald Rehbein Industrial 38.4 93055.59 1350 74107.13 <br /> Total Property Assessments 360105.75 360105.75 <br /> Total City Cost 0.00 0.00 <br /> TOTAL ASSESSMENT 360105.75 360105.75 <br /> TOTAL PROJECT COST 360105.75 360105.75 <br /> NOTES: <br /> If it is determined that any of the properties will or will not be served by the watennain <br /> constructed under this project, the assessments should be re- evaluated. <br />