Laserfiche WebLink
TABLE 2 <br /> ASSESSMENTS FOR WATERMAIN INTERCONNECTION <br /> CITY PAYS FOR WATERMAIN OVERSIZING <br /> Assessment Assessment <br /> Area per acre Front per FF <br /> '' P000rty Type acre S 1,999.97 Footage S 45.30 <br /> West Side of 20th Avenue <br /> Clearwater Meadows Outlot Commercial 43 9399.87 690 31259.92 <br /> Lake Area Utilities Commercial 17.6 35199.50 650 29447.75 <br /> Kenko "A" Commercial 2.9 5799.92 350 15856.48 <br /> Kenko'B" Commercial 1.7 3399.95 220 9966.93 <br /> Carpenter Commercial 5 9999.86 320 14497.35 <br /> Reel Manufacturing Commercial 3.6 7199.90 340 15403.44 <br /> Rehbein Inc "A" Commercial 6.6 13199.81 380 17215.61 <br /> Rehbein Inc "B" Commercial 6.6 13199.81 100 4530.42 <br /> Rehbein Inc "C" Commercial 1.2 2399.97 160 7248.68 <br /> East Side of 20th Avenue <br /> Sheehy Industrial 18.1 36199.48 650 29447.75 <br /> Herman Strehlow Industrial 21.1 42199.40 675 30580.36 <br /> Joyce Stevens Industrial 21.1 42199.40 675 30580.36 <br /> Gerald Rehbein Industrial 38.4 76798.90 1350 61160.71 <br /> Total Property Assessments 297195.75 297195.75 <br /> Total City Cost 62910.00 62910.00 <br /> TOTAL ASSESSMENT 360105.75 360105.75 <br /> TOTAL PROJECT COST 360105.75 360105.75 <br /> NOTES: <br /> If it is determined that any of the properties will or will not be served by the watermain <br /> constructed under this project, the assessments should be re- evaluated. <br />