Laserfiche WebLink
TABLE 4 <br /> ASSESSMENTS FOR WATERMAIN INTERCONNECTION <br /> CITY PAYS FOR WATERMAIN OVERSIZING & INTERCONNECT METER VAULT <br /> Assessment Assessment <br /> Area per acre Front per FF <br /> Property Type acre S` 1,66350 Footage E ' ' 37.6$ <br /> West Side of 20th Avenue <br /> Clearwater Meadows Outlot Commercial 4.7 7818.44 690 26000.77 <br /> Lake Area Utilities Commercial 17.6 29277.56 650 24493.48 <br /> Kenko "A" Commercial 2.9 4824.14 350 13188.80 <br /> Kenko'B" Commercial 1.7 2827.95 220 8290.10 <br /> Carpenter Commercial 5 8317.49 320 12058.33 <br /> Reel Manufacturing Commercial 3.6 5988.59 340 12811.97 <br /> Rehbein Inc "A" Commercial 6.6 10979.08 380 14319.27 <br /> Rehbein Inc "B" Commercial 6.6 10979.08 100 3768.23 <br /> Rehbein Inc "C' Commercial 1.2 1996.20 160 6029.16 <br /> East Side of 20th Avenue <br /> Sheehy Industrial 18.1 30109.31 650 24493.48 <br /> Herman Strehlow Industrial 21.1 35099.80 675 25435.54 <br /> Joyce Stevens Industrial 21.1 35099.80 675 25435.54 <br /> Gerald Rehbein Industrial 38.4 63878.31 1350 50871.08 <br /> Total Property Assessments 247195.75 247195.75 <br /> Total City Cost 112910.00 112910.00 <br /> TOTAL ASSESSMENT 360105.75 360105.75 <br /> TOTAL PROJECT COST 360105.75 360105.75 <br /> NOTES: <br /> If it is determined that any of the properties will or will not be served by the watermain <br /> constructed under this project, the assessments should be re- evaluated. <br />