Laserfiche WebLink
TABLE 3 <br /> ASSESSMENTS FOR WATERMAIN INTERCONNECTION <br /> CITY PAYS FOR INTERCONNECT METER VAULT <br /> Assessment Assessment <br /> Area per acre Front per FF <br /> Pro a Type acre $ 2,088.85 Footage S 47.27 <br /> West Side of 20th Avenue <br /> Clearwater Meadows Outlot Commercial 4.7 9808.19 690 32617.83 <br /> Lake Area Utilities Commercial 17.6 36728.54 650 30726.94 <br /> Kenko "A" Commercial 2.9 6051.86 350 16545.28 <br /> Kenko "B" Commercial 1.7 3547.64 220 10399.89 <br /> Carpenter Commercial 5 10434.24 320 15127.11 <br /> Reel Manufacturing Commercial 3.6 7512.66 340 16072.55 <br /> Rehbein Inc "A' Commercial 6.6 13773.20 380 17963.44 <br /> Rehbein Inc "B" Commercial 6.6 13773.20 100 4727.22 <br /> Rehbein Inc "C" Commercial 1.2 2504.22 160 7563.55 <br /> East Side of 20th Avenue <br /> Sheehy Industrial 18.1 37771.97 650 30726.94 <br /> Herman Strehlow industrial 21.1 44032.51 675 31908.75 <br /> Joyce Stevens Industrial 21.1 44032.51 675 31908.75 <br /> Gerald Rehbein Industrial 38.4 80135.00 1350 63817.49 <br /> Total Property Assessments 310105.75 310105.75 <br /> Total City Cost 50000.00 50000.00 <br /> TOTAL ASSESSMENT 360105.75 360105.75 <br /> TOTAL PROJECT COST 360105.75 360105.75 <br /> NOTES: <br /> If it is determined that any of the properties will or will not be served by the watermain <br /> constructed under this project, the assessments should be re- evaluated. <br />