My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-12-22 - CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-12-22 - CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2011 3:49:20 PM
Creation date
8/29/2011 3:49:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br /> PERMIT SURCHARGE <br /> Subdivision 1. Computation. To defray the costs of administering <br /> sections 16B.59 to 16B.73, a surcharge in imposed on all permits <br /> issued by municipalities in connection with the construction of <br /> or addition of alteration to buildings and equipment or <br /> appurtenances after June 30, 1971, as follows: <br /> If the fee for the permit issued is fixed in amount the surcharge <br /> is equivalent to one -half mill (.0005) of the fee or 50 cents, <br /> whichever amount is greater. For all other permits, the <br /> surcharge is as follows: <br /> (1) if the valuation of the structure, addition, or alteration <br /> is $1,000,000 or less, the surcharge is equivalent to one -half mill <br /> (.0005) of the valuation of the structure, addition, or alteration; <br /> (2) if the valuation is greater than $1,000,000, the surcharge <br /> is $500 plus two - fifths mill (.0004) of the value between <br /> $1,000,000 and $2,000,000; <br /> (3) if the valuation is greater than $2,000,000 the surcharge <br /> is $900 plus three- tenths mill (.0003) of the value between <br /> $2,000,000 and $3,000,000; <br /> (4) if the valuation is greater than $3,000,000 the surcharge <br /> is $1,200 plus one -fifth mill (.0002) of the value between <br /> $3,000,000 and $4,000,000; <br /> (5) if the valuation is greater than $4,000,000 the surcharge <br /> is $1,400 plus one -tenth mil (.0001) of the value between <br /> $4,000,000 and $5,000,000; and <br /> (6) if the valuation exceeds $5,000,000, the surcharge is <br /> $1,500 plus one - twentieth mill (.00005) of the value that exceeds <br /> $5,000,000. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.