My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-11-24 - CC Packet - (Admin.)
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1997
>
1997-11-24 - CC Packet - (Admin.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2011 10:04:08 AM
Creation date
8/30/2011 10:03:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Ability of the consultant to furnish adequate and effective construction supervi- <br /> APPENDIX Sion services, where such services are an inherent pan of a "package" of services for <br /> SAMPLE CONSULTANT QUALIFICATIONS CRITERIA LIST which the consultant is employed <br /> The sample list given below is generally based on one used successfully (without 20. Financial stability and capaci ty of the consultant to carry oul the kinds and extent <br /> significant controversy) for over 25 years by a medium -size city which engages of work needed <br /> consultants for die bulk of its design work. 21. Availability to the consultant of adequate amounts and forms of liability and <br /> 1. Educational background of key consultant personnel professional responsibility insurance <br /> 2. Experience record of the consultant team 22. Whether the consultant has offered an appropriate response to relevant policy <br /> 3. Record of success by the consultant, demonstrated by work previously per - regarding involvement of minorities, women, disadvantaged business, affinnative <br /> fonned for the agency or similar work performed for others action, etc. <br /> 4. Individual within the consultant's organization who w i l l have direct charge of 23.Other factors or special characteristics of the firth, its project team, or its outlook <br /> the work which provide a unique match with the agency's needs and/or objectives <br /> 5. Whether the consultant has adequate staff or other resources such as sub- The above ciiieria reflect important considerations, in botlitechnical and policy <br /> consultants to perform the work within the time allowance areas. Agencies may desire to add othercriteria and /or assign weighty to the various <br /> 6. The approach the consultant proposes to use for the work criteria to guide or assist interview panel members. <br /> 7. The abilily of the consultant to make effective public presentations of the report <br /> and /or design as may be required <br /> 8. The ability of the consultant to work effectively witlt agency staff, other public <br /> agencies, and related parties as may be required during the course of the design, study, <br /> or other technical services <br /> 9. Pertinent new ideas which may be presented by the consultant during the course <br /> of tine selection process <br /> 10. Where appropriate, whether the consultant has adequate knowledge of local <br /> conditions <br /> 11. Whether the consultant has supplementary technical certifications appropriate <br /> to the work involved <br /> 12. Whether the consultant has available experienced, capable, and acceptable <br /> resource and design professional personnel or consultants as may be pertinent to the <br /> particular project <br /> 13. Whether the consultant has demonstrated an appropriate level of effort as <br /> reflected by person -hours and classification of personnel allocated to the various tasks <br /> 14. Demonstrated continuing interest by the consultant in the success, eff icicncy, <br /> and workability of facilities the consultant has designed, both during construction and <br /> after they are placed in operation <br /> 15. Whether the consultant is already engaged in another project which has direct <br /> and substantial physical relationship to the proposed project <br /> 16. When an existing facility is being modified or added to, whether tie original <br /> designer of the facility should be retained for are new work on grounds of economy, <br /> detailed knowledge of the existing facility, or esthetic or technical necessity of <br /> involving the same design philosophy <br /> 17. Whether the consultant has an cflective qualily conuol progrun, such as <br /> independent design review <br /> 18. "fheconsullant's record of kecpingcon.cuuclion coslx within project budgets anal <br /> design estimates <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.