Laserfiche WebLink
I. BITUMINOUS CURB AND GUTTER LF 71 5.00 355.00 0.00 0.00 0% 0.00 0.00 0% <br /> 11 6' CONCRETE DRIVEWAY/APRON SY 12 30.00 360.00 0.00 0.00 0% 0.00 0.00 0% <br /> 14 BITUMINOUS DRIVEWAY RESTORATION SY 25 15.00 175.00 0.00 0.00 0% 0,00 000 0% <br /> 15 4" CONCRETE WALK SF 300 2.60 780.00 0.00 0.00 0% 0.00 0.00 0% <br /> 16 AIR VOIDS TEST EA 5 120.00 60.0 0.00 0.00 0% 0.00 0.00 0% <br /> 17 CONCRETE CYLINDER (PER SET OF 3) EA 5 40.00 200.00 0.00 0.00 0% 0.00 0.00 0% <br /> 18 GRADATION TEST EA 3 120.00 360,00 0.00 0.00 0% 0.00 0.00 0% <br /> 19 PROCTOR TEST EA I 40.OD 40.00 0.00 0.00 0% 0.00 0.00 0% <br /> 20 INPLACE DENSITY TEST FA 20 30.00 600.00 0.00 0.00 0% 0.00 0.00 0% <br /> T SCHEDULE 2.0 STREET CONSTRUC17ION - TOTAL 130,245.50 0.00 0.00 <br /> PERCENTAGE OF SCHEDULE 2.0 COMPLETED: 0% <br /> SCHEDULE 3.0 WATERMAIN <br /> I CONNECT TO EXISTING WATERMAIN EA 2 1,000.00 2,000.00 1.00 1,000.00 50% 1.00 1,000.00 50% <br /> 2 VALVE MANHOLE EA 1 1,800.00 1,800.00 1.00 1,800.00 100% 1.00 1,800.00 100% <br /> 3 CREEK CROSSING 'A" LS I 4,000-00 4,000.00 1.00 4,00.00 100% 1.00 4.000.00 1009, <br /> 4 CREEK CROSSING *B' Ls I 4,500.0 4,500.00 0.00 0.00 0% 0.09 0,00 0% <br /> 5 10" PVC WATERMAIN LF 1,100 15m 16,500.09 425,00 6,175.00 39% 425.00 6,375.00 39% <br /> 6 6' PVC WATERMAIN LF I ' sm 12.00 21,960.00 1,272.00 15,264.00 70% 1,584.00 19,008.00 87% <br /> 7 10" GATE VALVE AND BOX! EA 3 650.00 1,950.00 0,00 0,00 0% 0.00 0.00 0% <br /> 8 6" GATE VALVE AND BOX FA 5 350.00 1,750.00 3,00 1,050.00 60% 3.00 1,050.00 60% <br /> 9 HYDRANT AND GATE VALVE ASSEMBLY EA 9 2,100-00 18,900.00 5,00 10,500.00 56% 5-00 10,500.00 56% <br /> 10 FITTINGS LB 3,015 1.00 3,015.00 2,100,0 2,100.00 70% 2,250.00 2,250.00 75% <br /> 11 WATER SERVICE CONNECT EA 31 150.00 4,650.00 18.00 2,700.00 58% 18,00 2,700.00 58% <br /> 12 V COPPER SERVICE PIPE LF 1,500 7.00 10,500.00 795,00 5,565.00 53% 795.00 5,565.00 53% <br /> 13 GRANULAR FOUNDATION MATERIAL LF 2,764 0101 27.64 0.00 0,00 0% 0,00 0.00 07 <br /> 14 PROCTOR TEST EA 1 40,00 40.00 Loo 40.00 100% 1.00 40.0 100% <br /> 15 INPLACE DENSITY TEST EA 30 30.00 900.09 12.00 360.00 4D% 14.00 420.00 47% <br /> SCHEDULE 3.0 WATERMAIN - TOTAL 92,492,64 50,754.0 54,708.00 <br /> PERCENTAGE OF SCHEDULE 3.0 COMPLETED: 59% <br /> n:N 12601260077#2.XLS GE 2 260-077-30 <br />