SCHEDULE d SA NIT ARYMWER <br /> I CONNECT TO EXISTING SANITARY SEWER EA 1 900.00 900.00 1.00 900.00 100% 1.00 900.00 100% <br /> 2 CONNECT TO EXISTING SANITARY MH EA 1 1,500.00 1,500.00 1.00 1,500.00 100% 1.00 1,500.00 100% <br /> 3 JACK13ORE STEEL CASING PIPE LF 75 150.00 11,250.00 37.50 5,625.00 50% 75.00 11,250.00 100% <br /> 4 12- PVC SANITARY SEWER LF 125 30.00 3,750.00 125.00 3,750.00 100% 125.00 3,750.00 100% <br /> 5 12' PVC SANITARY SEWER (12-14') LF 447 30.00 13,410.00 375.00 11,250.00 84% 375.00 11,250.00 94% <br /> 6 8' PVC SANITARY SEWER (M LF 362 26.00 9,412.00 0.00 0.00 0% 719.00 18,694.00 199% <br /> 7 8 PVC SANITARY SEWER (8-10') LF 225 26.00 5,850.00 0.00 0.00 0% 0.00 0.00 0% <br /> 8 8- PVC SANITARY SEWER (10-12') LF 771 26.00 20,046.00 631.00 16,406.00 82% 631.00 16,406.00 82% <br /> 9 8- PVC SANITARY SEWER (12-14') LF 90 26.00 2,080.00 0.00 0.00 0% 0.00 0.00 0% <br /> 10 SANITARY MANHOLE (0 - 8') FA 10 1,250.00 12,500.00 7.00 8,750-00 70% 11.00 13,750.00 110% <br /> 11 MANHOLE EXTRA DEPTH (> 8') LF 41 80.00 3,290.00 33.00 2,640.00 80% 41.57 3,325.60 IN % <br /> 12 12"x4' WYE EA 8 75.00 600.00 7.00 525.00 88% 7.00 525.00 88% <br /> 13 8*x4" WYE FA 23 40.00 920.00 8.00 320.00 35% 26.00 1,040.00 113% <br /> 14 4' SERVICE PIPE LF 1,850 6.00 11,100.00 394.00 2,364,00 21% 876.00 5,256.00 47% <br /> 15 GRANULAR FOUNDATION MATERIAL LF 1,810 0.01 18.10 0.00 0.00 ()% 000 0.00 0% <br /> 16 PROCTOR TEST EA 1 40.00 40.00 1.00 40,00 100% 2.00 80.00 200% <br /> 17 INPLACE DENSITY EA 30 30.00 900.00 3,00 90.00 10% 11.00 330.00 37% <br /> T SCHEDULE 4.0 SANITARY SEWER - TOTAL 97556.10 54,160.00 88,056.60 <br /> PERCENTAGE OF SCHEDULE 4.0 COMPLETED: 90% <br /> SCHEDULE 5.0 STORM SEWER <br /> I REMOVE 15" CMP LF 60 1.00 420.00 60.00 420.00 100% 60.09 420.00 100% <br /> 2 18" RCP STORM SEWER LF 404 32.00 12.928.00 147.00 4,700.00 36% 147.00 4,704.00 36% <br /> 3 18" RCP APRON FA 4 500,00 z,ow_m 1.00 500.00 25% 1.00 500.00 25% <br /> 4 2'x3' CATCH BASIN EA 4 750.00 3,000.00 0.00 0.00 0% 0.00 0.00 ()% <br /> 5 RIP-RAP, CL III CY 8 60.00 480.00 0,00 0.00 0% 0.00 0.00 0% <br /> 7 SCHEDULE 5.0 STORM SEWER -TOTAL 18,828.00 5,624.00 5,624.00 <br /> PERCENTAGE OF SCHEDULE 6.0 COMPLETED: 30% <br /> n. 112601260077#2.XLS AGE 3 260 -077-30 <br />