<br /> Contract Unit Current .Quantlty Amount
<br />No. Item Unit Quantity Price Quantity to Date to Date
<br /> Part 1 - Sanitary Sewer
<br />1 MOBILIZATION LS 34000.00 1 $34,000.00
<br />2 8- PVC SANITARY SEWER, SDR 35, 8'.10'
<br /> DEEP LF 225 25.65 225 $5,n1.25
<br />3 8- PVC SANITARY SEWER, SDR 35, 10'.12'
<br /> DEEP. LF 100 25.65 100 $2,565.00
<br />4 8- PVC SANITARY SEWER, SDR 35, 12'.14'
<br /> DEEP LF 705 25.65 705 $18,083.25
<br />5 8- PVC SANITARY SEWER, SDR 35, 14'-16'
<br /> DEEP LF 340 25.65 140 $3,591.00
<br />6 1T PVC SANITARY SEWER, SDR 35, 10'-12'
<br /> DEEP LF 1020 27.75 1020 $28,305.00
<br />7 12- PVC SANITARY SEWER, SDR 35, 12'-14'
<br /> DEEP LF 1022 27.75 1022 $28,360.50
<br />8 12- PVC SANITARY SEWER, SDR 35,14'-16'
<br /> DEEP LF 570 27.75 571 $15,845.25
<br />9 4- PVC, SCH. 40 RISER PIPE LF 50 19.00 57 $1,083.00
<br />10 sa PVC FORCEMAlN LF 110 24.25 110 $2,667.50
<br />11 8- X 4- PVC WYE EA 23 75.00 14 $1,050.00
<br />12 12- X 4- PVC WYE EA 14 130.00 21 $2,730.00
<br />13 4' DIAMETER SANITARY MH, 8' DEEP EA 19 1900.00 19 $36,100.00
<br />14 4' DIAMETER SANITARY MANHOLE
<br /> OVERDEPTH LF -76 145.00 76 $11,020.00
<br />15 CONSTRUCT MANHOLE OVER EXISTING PIPE EA 1 2100.00 1 $2,100.00
<br />16 IMPROVED PIPE FOUNDATION LF 3982 1.90 2551 $4,846.90
<br />17 SEEDING AC 1 1300.00 $0.00
<br />18 CLOSED CIRCUIT TV INSPECTION LF 3982 0.60 3783 $2,269.80
<br />19 CLEARING AND GRUBBING LS 1 5000.00 1 $5,000.00
<br /> Total Part 1 - Sanitary Sewer $205,388.45
<br /> Part 1 - SanItary Sewer - Bid Amount Total- $214,261.00
<br /> Part 2 - Water Main
<br />20 12- PVC WATER MAIN LF 3220 23.00 3223 $74,129.00
<br />21 8- PVC WATER MAIN LF 160 23.00 160 $3,680.00
<br />22 6- PVC WATER MAIN LF 600 23.00 557 $12,811.00
<br />23 12- GATE VALVE AND BOX EA 5 1300.00 5 $6,500.00
<br />24 8- GATE VALVE AND BOX EA 3 760.00 3 $2,280.00
<br />25 sa GATE VALVE AND BOX EA 6 565.00 6 $3,390.00
<br />26 INSTALL HYDRANT EA 4 2000.00 4 $8,000.00
<br />27 CONNECT TO E>qSTING WATER MAIN EA 1 600.00 1 $600.00
<br />28 DUCTILE IRON FITTINGS LB 10000 0.85 10330 $8,780.50
<br />29 IMPROVED PIPE FOUNDATION LF 2000 1.90 1290 $2,451.00
<br />30 REMOVE BITUMINOUS DRIVEWAY SY 20 2.80 $0.00
<br />31 SAWING BITUMINOUS PAVEMENT LF 20 5.00 $0.00
<br />32 3" TYPE 41A, BIT. DRIVEWAY PAVEMENT SY 20 28.65 $0.00
<br />33 SEEDING AC 0.4 1300.00 $0.00
<br />34 SALVAGE AND REINSTALL GRAVEL
<br /> DRIVEWAY SY 830 4.00 830 $3,320.00
<br />35' SALVAGE AND REINSTALL 24- RCP LS 1 670.00 1 $670.00
<br />36 AGGREGATE BASE, CLASS 5 TN 150 12.00 285 $3,420.00
<br />37 12- PIPE RESTRAINT EA 48 115.00 48 $5,520.00
<br />38 8" PIPE RESTRAINT EA 14 100.00 14 $1,400.00
<br />39 6" PIPE RESTRAINT EA 28 100.00 28 $2,800.00
<br /> Total Part 2 - Water Main $139,751.50
<br /> Part 2 - Water Main - Bid Amount Total. $141,369.00
<br /> .Part 3 - Services
<br />40 1- CORPORATION STOP EA 22 125.00 22 $2,750.00
<br />41 1- CURB STOP AND BOX EA 22 135.00 22 $2,970.00
<br />42 1- TYPE "K" COPPER WATER SERVICE LF 900 18.00 986 $17,748.00
<br />43 4- PVC, SCH. 40 SERVICE PIPE LF 1000 20.00 1049 $20,980.00
<br /> Total Part 3 - Services $44,448.00
<br /> Part 3 - Services - Bid Amount Total- $41,920.00
<br /> Part 4 - Storm Sewer
<br />44 1T RCP STORM SEWER, CLASS 5 LF 260 28.50 126 $3,591.00
<br />616l10117REQ1
<br />
|