Laserfiche WebLink
<br /> Contract Unit Current Quantity Amount <br />No. Item Unit Quantity Price Quantity to Date to Date <br />45 15" RCP STORM SEWER, CLASS 5 LF 990 30.00 315 $9,450.00 <br />46 2r RCP STORM SEWER, CLASS 3 LF 197 46.65 197 $9,190.05 <br />47 30. HOPE STORM SEWER LF 134 35.00 134 $4,690.00 <br />48 18- HOPE STORM SEWER LF 129 20.65 116 $2,395.40 <br />49 15" HOPE STORM ~EWER LF 143 17.00 127 $2,159.00 <br />50 12- HOPE STORM SEWER LF 249 16.00 255 $4,080.00 <br />51 4' DIAMETER STORM CBMH EA 6 1500.00 6 $9,000.00 <br />52 5' DIAMETER STORM CBMH EA 3 2400.00 3 $7,200.00 <br />53 SKlMMER'STRUCTURE EA 1 1100.00 1 $1,100.00 <br />54 'Z X 3' CATCH BASIN EA 4 1400.00 4 $5,600.00 <br />55 30. HOPE FLARED END SECTION WITH <br /> TRASH GUARD EA 1 1085.00 1 $1,085.00 <br />56 2r RCP FLARED END SECTION, INCLUDING <br /> TRASH GUARD EA 1 1300.00 1 $1,300.00 <br />57 18- HOPE FLARED END SECTION WITH <br /> TRASH GUARD EA 1 345.00 1 $345.00 <br />58 15" RCP FLARED END SECTION EA 3 360.00 3 $1,080.00 <br />59 15" HOPE FLARED END SECTION WITH <br /> TRASH GUARD EA 1 265.00 1 $265.00 <br />60 12- HOPE FLARED END SECTION EA 2 160.00 2 $320.00 <br />61 CLASS III RANDOM RIPRAP CY 115 60.00 109 $6,540.00 <br />62 IMPROVED PIPE FOUNDATION LF 700 1.90 $0.00 <br />63 SEEDING AC -0.5 1300.00 $0.00 <br />64 SILT FENCE, REGULAR LF 300 5.00 $0.00 <br />65 HAY BALES LF 200 7.00 $0.00 <br />66 PROTECTION OF CATCH BASIN IN STREET EA 12 50.00 $0.00 <br />67 DITCH EXCAVATION LF 300 4.00 50 $200.00 <br /> Total Part 4 - Storm Sewer $69,590.45 <br /> Part 4 - Storm Sewer - Bid Amount Total - $100,943.90 <br /> Part 5 - Street <br />68 MIU BITUMINOUS PAVEMENT l' WIDE LF 100 4.70 100 100 $470.00 <br />69 SUBGRADE PREPARATION SY 9100 1.00 9100 $9,100.00 <br />70 GEOTEXTILE FABRIC, TYPE V SY 9100 1.75 9100 $15,925.00 <br />71 SELECT GRANULAR BORROW (CV) CY 5500 5.50 5500 $30,250.00 <br />72 AGGREGATE BASE, CLASS 5 TN 3100 12.00 3405 $40,860.00 <br />73 TYPE 31 BITUMINOUS BASE COURSE TN 870 30.70 898.3 $27,577.81 <br />74 BITUMINOUS WEAR COURSE, TYPE 41 (2002) TN 690 34.95 721.7 721.7 $25,223.42 <br />75 BITUMINOUS MATERIAL FOR TACK C()AT GAL 400 1.60 350 425 $680.00 <br />76 SURMOUNTABLE CONCRETE CURB AND <br /> GUTTER LF 4200 7.40 3866 $28,608.40 <br />77 WATER FOR DUST CONTROL 1000 GAL 100 20.00 $0.00 <br />78 4- PERFORATED POLYETHYLENE PIPE LF 4200 4.85 4200 $20,370.00 <br />79 TYPE III BARRICADE EA 6 150.00 $0.00 <br />80 SKlDSTEER (BOBCAT) WITH OPERATOR HR 10 75.00 5 5 $375.00 <br />81 STREET SWEEPER WIPICK UP BROOM & <br /> OPERATOR HR 10 100.00 5 10 $1,000.00 <br />82 SEEDING AC 1.5 1300.00 $0.00 <br />83 4- CONCRETE SIDEWALK SY 8000 2.35 6730 $15,815.50 <br />84 AGGREGATE BASE, CLASS 5 - TRAIL TN 250 12.00 249.4 $2,992.80 <br />85 BITUMINOUS WEAR COURSE, TYPE 41A. <br /> PATHWAY (2002) TN 75 51.50 99.5 $5,124.25 <br /> Total Part 5 - Street $224,372.18 <br /> Part 5 - Street - Bid Amount Total- $228,122.00 <br /> <br />Total Part 1 - Sanitary Sewer <br />Total Part 2 - Water Main <br />Total Part 3 - Services <br />Total Part 4 - Storm Sewer <br />Total Part 5 - Street <br />Total Work Completed To Date <br /> <br />$205,388.45 <br />$139,751.50 <br />$44,448.00 <br />$69,590.45 <br />$224,372.18 <br />$683,550.58 <br /> <br />816l10117RE01 <br />