My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08-27 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-08-27 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:56:08 PM
Creation date
2/10/2006 11:28:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Introduction and Recommendations <br /> <br />Introduction <br /> <br />This report reviews the expansion of Centerville' water system through the addition of a <br />500,000 gallon elevated water tower and trunk water mains. This tower is needed to <br />adequately serve the City as it develops towards saturation and expands into the next decade. <br />The tower is also needed to: <br /> <br />· maintain an effective balance between supply and storage, <br />· increase and provide reliable fire flow capabilities within the water distribution network, <br />especially on the outer fringes of the City, <br />· provide a stable hydraulic basis for the operation of the water system, and <br />· maximize efficiency within the water distribution network with the adjacent water <br />system in Lino Lakes. <br /> <br />This report reviews the construction of a water tower on City owned property next to the <br />City Public Works Facility on 20th Avenue. Three factors were involved in choosing the size <br />and type of water tower to be constructed - cost, reliability, and system operation. These <br />factors are reviewed in this report. The location of the existing storage site and proposed <br />tower are shown on Figure 1. <br /> <br />Construction of this water tower is consistent with recommendations from the 1997 <br /> <br />Comprehensive Water Plan prepared by MSA Consulting Engineers. The 1997 Plan <br />recommended a 400,000 gallon tower be constructed by the year 2000 to give the City a total <br />storage of 500,000 gallons. This report verifies the planned system expansion and <br />recommends that a 500,000 gallon tower be constructed with the high water level raised 6.5 <br />feet to match the water level of the City of Lino Lakes water system, and recommends that <br />the City's existing water tower be removed from the system. The report also looks briefly at <br />the expansion of supply to meet the anticipated future maximum day demand. <br /> <br />Water Tower Feasibility Report <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.