My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08-27 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-08-27 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:56:08 PM
Creation date
2/10/2006 11:28:41 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Recommendations <br />From an engineering standpoint, the work presented in this report is feasible. The water <br />tower is necessary in the near future to serve the City. The Staff and Council will need to <br />review and analyze the financial aspects of the proposed work. The following <br />recommendations are offered for City Council consideration: <br /> <br />1. This report should be adopted as the official guide for the water tower described <br />herein. This report should supplement the data contained in the 1997 <br />Comprehensive Water Plan. <br /> <br />2. A 500,000 gallon water tower with a high water elevation of 1054.5 should be <br />constructed. <br /> <br />3. At a minimUm, bids should be received on fluted column and water spheroid water <br />towers to allow a comparison based on as-bid costs. Additionally, the City could <br />look at the composite style of tank, but this would likely cost more for this size of <br />tank. A City Council decision regarding tank type will be required before awarding <br />the contract. <br /> <br />4. The tower should be constructed on the existing City owned site at the Public Works <br />Facility since it offers the lowest overall cost. The estimated total project costs for <br />the water tower is between $1,000,000 and $1,100,000. <br /> <br />5. The water tower project will require approximately 18 months to complete. Project <br />completion is required by July 2005. <br /> <br />6. Preparation of a wellhead protection plan in accordance with the rules should be <br />considered. Planning for siting a new well should begin soon when maximum day <br />demands get closer to the well supply firm capacity of 0.9 MOD (625 gpm). Before <br />the well is to be drilled, the City needs to do an aquifer study to make sure the new <br />well can be supported at the existing Well No.2 field. <br /> <br />Water Tower Feasibility Report <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.