Laserfiche WebLink
<br />APPENDIX A <br />COST ESTIMATE <br />HUNTERS CROSSING 2ND ADDmON <br /> <br />Item <br /> <br />Unit <br /> <br />Qty <br /> <br />Unit Price <br /> <br />PART 1 . SANITARY SEWER. HUNTERS ~ROSSING . SECOND ADDITION. PHASE 1 <br /> <br />8" PVC, SDR 35,8' -10' DEEP <br />8" PVC, SDR 35, 10' -12' DEEP <br />8" PVC, SDR 35,12' -14' DEEP <br />8" PVC, SDR 35, 14' -16' DEEP <br />CONNECT TO EX. PIPE <br />4' DIA SANITARY MANHOLE <br />MANHOLEOVERDEPTH <br />IMPROVED PIPE FOUNDATION <br />CLOSED CIRCUIT TV INSPECTION <br /> <br />LF 302 $20.00 <br />LF 603 $24.00 <br />LF 660 $26.00 <br />LF 585 $28.00 <br />EA 1 $1,000.00 <br />EA 9 $1,500.00 <br />LF 44 $110.00 <br />LF 2150 $2.00 <br />LF 2150 $1.00 <br />Subtotal <br />5% Contingency <br />Subtotal <br />30% Indirect Costs <br />Total Cost - Sanitary Sewer - Hunters Crossing - Phase 1 <br /> <br />Total <br /> <br />$6,040 <br />$14,472 <br />$17,160 <br />$16,380 <br />$1,000 <br />$13,500 <br />$4,840 <br />$4,300 <br />$2,150 <br />$79,842 <br />$3,992 <br />$83.834 <br />$25,150 <br />$108,984 <br /> <br />PART 2. WATER MAIN . HUNTERS CROSSING. SECOND ADDITION. PHASE 1 <br />8" PVC, JACKED UNDER ROAD LF 50 $150.00 $7,500 <br />8" PVC, C900 WATER MAIN LF 1630 $18.00 $29,340 <br />6" PVC, C900 WATER MAIN LF 705 $15.00 $10,575 <br />8" GATE VALVE AND BOX EA 3 $800.00 $2,400 <br />6" GATE VALVE AND BOX EA 4 $600.00 $2,400 <br />CONNECT TO EXISTING WATERMAIN EA 2 $750.00 $1,500 <br />HYDRANT WI VALVE EA 5 $2,000.00 $10,000 <br />FITTINGS LBS 3650 $1.50 $5,475 <br />IMPROVED PIPE FOUNDATION LF 2335 $1.00 $2,335 <br />8" PIPE RESTRAINT EA 37 $40.00 $1,480 <br />6A PIPE RESTRAINT EA 30 $30.00 $900 <br /> Subtotal $73,905 <br /> 5% Contingency $3,695 <br /> Subtotal $77,600 <br /> 30% Indirect Costs $23,280 <br /> Total Cost - Water Main - Hunters Crossing - Phase 1 $100,880 <br />PART 3 . SERVICES. HUNTERS CROSSING - SECOND ADDITION. PHASE 1 <br />8" X 4" PVC WYE EA 35 $60.00 $2,100 <br />4" PVC SEWER SERVICE LF 1400 $10.00 $14,000 <br />4" PVC RISER PIPE LF 25 $13.00 $325 <br />1" COPPER WATER SERVICE LF 1100 $10.00 $11,000 <br />1" CURB STOP & BOX EA 35 $100.00 $3,500 <br />1" CORPORATION STOP EA 35 $75.00 $2,625 <br /> Subtotal $33,550 <br /> 5% Contingency $1,678 <br /> Subtotal $35,228 <br /> 30% Indirect Costs $10,568 <br /> Total Cost - Services - Hunters Crossing - Phase 1 $45,796 <br /> <br />1:\616\61603132\Word\Work_ln_Progress\Appendlx A.xls <br /> <br />1 <br />