Laserfiche WebLink
<br />Item Unit Qty Unit Price Total <br />PART 4 . STORM SEWER. HUNTERS CROSSING. SECOND ADDmON . PHASE 1 <br />12" RCP, CL. 5 STORM SEWER LF 140 $25.00 $3,500 <br />15" RCP, CL. 5 STORM SEWER LF 720 $28.00 $20,160 <br />18" RCP, CL. 5 STORM SEWER LF 1050 $30.00 $31,500 <br />21" RCP, CL. 4 STORM SEWER LF 71 $33.00 $2,343 <br />21" HDPE STORM SEWER LF 300 $30.00 $9,000 <br />2 X 3 CATCH BASIN EA 4 $1,200.00 $4,800 <br />CATCH BASIN MANHOLE EA 10 $1,400.00 $14,000 <br />MANHOLE EA 2 $1,500.00 $3,000 <br />POND OUTLET STRUCTURE EA 1 $2,000.00 $2,000 <br />12" RCP FLARED END SECTION EA 1 $600.00 $600 <br />18" RCP FLARED END SECTION EA 3 $900.00 $2,700 <br />21" RCP FLARED END SECTION EA 1 $1,200.00 $1,200 <br />ROCK RIPRAP, CL. 3 CY 60 $50.00 $3,000 <br /> Subtotal $97,803 <br /> 5% Contingency $4,890 <br /> Subtotal $102,693 <br /> 30% Indirect Costs $30,808 <br />Total Cost - Storm Sewer - Hunters Crossing - Phase 1 $133,501 <br />PART 5 . STREET. HUNTERS CROSSING. SECOND ADDmON . PHASE 1 <br />SUBGRADE PREPARATION SY 9100 $0.75 $6,825 <br />SELECT GRANULAR BORROW (CV) CY 5060 $10.00 $50,600 <br />AGGREGATE BASE, CL. 5 TN 3300 $8.50 $28,050 <br />BITUMINOUS BASE COURSE TN 750 $33.00 $24,750 <br />BITUMINOUS MATERIAL FOR TACK GAL 450 $1.50 $675 <br />BITUMINOUS WEAR COURSE TN 725 $35.00 $25,375 <br />SURMOUNTABLE CONC. CURB AND GUTTER LF 4300 $6.50 $27,950 <br />BARRICADES EA 2 $500.00 $1,000 <br />4" POLY DRAIN TILE LF 4300 $6.00 $25,800 <br />GEOTEXTILE FABRIC SY 9100 $1.50 $13,650 <br />TRAIL - Subgrade preparation SY 980 $0.75 $735 <br />TRAIL - Class 5 Aggregate Base TN 360 $15.00 $5,400 <br />TRAIL - Bituminous Wear Course TN 120 $50.00 $6,000 <br />SIDEWALK - Class 5 Aggregate Base TN 160 $20.00 $3,200 <br />SIDEWALK - Concrete SF 5000 $3.00 $15,000 <br />SKIDSTER (BOBCAT WITH OPERATOR) HR 20 $75.00 $1,500 <br />WATER FOR DUST CONTROL 1000 GAL 50 $5.00 $250 <br />SEEDING WI TOPSOIL AND MULCH AC 0.5 $1,500.00 $750 <br /> Subtotal $237,510 <br /> 5% Contingency $11,876 <br /> Subtotal $249,386 <br /> 30% Indirect Costs $74,816 <br />Total Cost - Street - Hunters Crossing - Phase 1 $324,201 <br /> <br />1:\616\61603132\Word\Work_ln_ProgresslAppendix A.xls <br /> <br />2 <br />