My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-23 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-07-23 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:56:20 PM
Creation date
2/10/2006 2:42:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Item Unit Qty Unit Price Total <br />PART 9 - SANITARY SEWER - HUNTERS CROSSING - SECOND ADDITION - PHASE 2 <br />8n PVC, SDR 35. 8' -10' DEEP LF 155 $20.00 $3,100 <br />8n PVC, SDR 35, 10' -12' DEEP LF 950 $24.00 $22,800 <br />8n PVC, SDR 35,12' -14' DEEP LF 642 $26.00 $16,692 <br />CONNECT TO EX. PIPE EA 2 $1,000.00 $2,000 <br />4' DIA SANITARY MANHOLE EA 9 $1,500.00 $13,500 <br />MANHOLE OVERDEPTH LF 30 $110.00 $3,300 <br />IMPROVED PIPE FOUNDATION LF 1750 $2.00 $3,500 <br />CLOSED CIRCUIT TV INSPECTION LF 1750 $1.00 $1,750 <br />MOBILIZATION LS 1 $5,000.00 $5,000 <br /> Subtotal $71,642 <br /> 5% Contingency $3,582 <br /> Subtotal $75,224 <br /> 30% Indirect Costs $22,567 <br /> Total Cost -Sanitary Sewer - Hunters Crossing - Phase 2 $97.791 <br />PART 10 - WATER MAIN - HUNTERS CROSSING - SECOND ADDITION - PHASE 2 <br />6n PVC, C900 WATER MAIN LF 1900 $15.00 $28,500 <br />6n GATE VALVE AND BOX EA 2 $600.00 $1.200 <br />HYDRANT WI VALVE EA 5 $1,800.00 $9,000 <br />FITTINGS LBS 1300 $1.50 $1,950 <br />IMPROVED PIPE FOUNDATION LF 1900 $1.00 $1,900 <br />6n PIPE RESTRAINT EA 45 $30.00 $1,350 <br /> Subtotal $43,900 <br /> 5% Contingency $2,195 <br /> Subtotal $46,095 <br /> 30% Indirect Costs $13,829 <br /> Total Cost - Water Main - Hunters Crossing - Phase 2 $59,924 <br /> <br />PART 11 - SERVICES - HUNTERS CROSSING - SECOND ADDITION - PHASE 2 <br /> <br />8n X 4n PVC WYE <br />4n PVC SEWER SERVICE <br />4n PVC RISER PIPE <br />in COPPER WATER SERVICE <br />1. CURB STOP & BOX <br />1 n CORPORATION <br /> <br />EA 37 $60.00 <br />LF 1600 $9.00 <br />LF 10 $13.00 <br />LF 1250 $10.00 <br />EA 37 $100.00 <br />EA 37 $75.00 <br />Subtotal <br />5% Contingency <br />Subtotal <br />30% Indirect Costs <br />Total Cost - Services - Hunters Crossing - Phase 2 <br /> <br />1:\616\61603132\Word\Work_ln_Progress\Appendlx A.xls <br /> <br />$2,220 <br />$14,400 <br />$130 <br />$12,500 <br />$3,700 <br />$2,775 <br />$35,725 <br />$1,786 <br />$37,511 <br />$11,253 <br />$48,764 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.