My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-07-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2007 3:41:30 PM
Creation date
2/10/2006 3:43:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Centerville <br />June 25, 2003 <br />Council Meeting Minutes <br /> <br />Mr. Palzer suggested looking at a design for the renovation before spending money <br />investigating the footings. He then said that he did not feel that the building was set up to <br />handle a second story. <br /> <br />Council Member Capra indicated that she would like to see if public works would be <br />willing to work with a contractor to come up with a design for an expansion. <br /> <br />Mayor Sweeney asked what kind of use Council Member Capra was thinking of because <br />right now it could be used for concessions and the warming house and he feels it may <br />cost a lot more to remodel the existing building than to build a whole new structure. <br /> <br />Council Member Capra indicated that she felt it was ridiculous to spend $30,000 to run <br />water and would rather use the money for improving the structure. She then indicated <br />she would like to see a window facing the skating rink so that the attendant can see out. <br /> <br />Council Member Broussard Vickers indicated there is little use out of this building and <br />both would be seasonal structures. <br /> <br />Council Member Capra commented that the one in the middle of the field is only for <br />summer where the one closer to the ice rink would be winter too. <br /> <br />Council Member Lee indicated the only way to USe the building is to make it bigger and <br />add a gym and some type of community center. <br /> <br />Mayor. Sweeney indicated that nobody is looking at a multimillion dollar building but ~ <br />there is the potential for softball tournaments and a whole summers worth of little league,,() - <br />~ the building could make money for three months. <br /> <br />Council Member Broussard Vickers indicated that she would not argue about how long it <br />is used if it is being donated. She then said that she would like to get the roof done at this <br />time. <br /> <br />Mayor Sweeney indicated the Lions volunteered to donate labor and would accept a <br />donation for doing it if the City saw fit to do so. <br /> <br /> <br />2. City Hall Security System <br /> <br />Ms. Moore-Sykes indicated that Council had previously approved an amount for <br />installing card key access for the front and back door. She then indicated that Staff is <br />seeking approval to add the inside door to the offices as that should be locked and is not <br /> <br />Page 9 of12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.