My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-07-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2003
>
2003-07-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2007 3:41:30 PM
Creation date
2/10/2006 3:43:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Centem.lle <br />June 25, 2003 <br />Council Meeting Minutes <br /> <br />Mr. Eilertson reviewed the bond sale results for Council indicating that Northland <br />Securities was the low bidder. He then explained that Northland Securities was required <br />to submit a bid 15 minutes before the sale in order to avoid any impropriety. <br /> <br />Motion bv Council Member Broussard Vickers. seconded bv Council Member Lee <br />to approve Resolution #03.,.040 as presented. All in favor. Motion carried <br />unanimousl~ <br /> <br />Patrie;. a_~~enterville Road indicated that her neighbors brought to her <br />attention a proposed sidewalk along with the water assessment. <br /> <br />Mr. Peterson indicated the sidewalk was added during the design of the overall project to <br />determine what the costs for extending the sidewalk would be. He then indicated that the <br />estimated cost to each resident for the sidewalk extension would be $2,800.00. <br /> <br />Council Member Broussard Vickers indicated that the sidewalk has not been approved at <br />this point as Council wanted information on the costs associated with it. Mr. Peterson <br />indicated the City had not done this before as usually sidewalks are added with <br />developments. <br /> <br />Council. Member Capra asked why the bid was for concrete rather than bituminous. Mr. <br />Peterson indicated that the contractor bid the concrete a lot less than the bituminous. He <br />then indicated that a few trees and landscaping would need to be dealt with along with <br />excavating 8 or 9 inches of material. <br /> <br />Council Member Broussard Vickers questioned whether there was a need for the <br />sidewalk. <br /> <br />Council Member Capra suggested using park dedication fees to extend the sidewalk as it <br />is an extension of existing trailways. <br /> <br />Council Member Broussard Vickers indicated she did not feel it was necessary to spend <br />that amount of money for the small gain. <br /> <br />Council Member Capra indicated she would like to use money out of park dedication fees <br />to make the connection. Mr. Peterson indicated there would still be a gap from <br />Centerville Road to--Peltier Circle. <br /> <br />Council Member Capra asked when that road was scheduled for reconstruction. Mr. <br />Peterson indicated it was set for five years. <br /> <br />Mr. Peterson indicated there is a lot of water in the comer requiring drain tiling. He then <br />commented that a resident in that location is having issues with his concrete driveway <br />heaving. <br /> <br />Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.