My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2024
>
2006
>
2006-02-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2006 2:36:15 PM
Creation date
2/17/2006 1:58:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />02-17-06 <br /> <br />5. CHANGES IN OFFICIAL CONTROLS. For two (2) years from the date of <br /> <br />this Agreement, no amendments to the City's Comprehensive Plan or official controls shall apply <br /> <br />to or affect the use, development density, lot size, lot layout or dedications ofthe approved Plat <br /> <br />unless required by state or federal law or agreed to in writing by the City and the Developer. <br /> <br />Thereafter, notwithstanding anything in this Agreement to the contrary, to the full extent <br /> <br />permitted by state law the City may require compliance with any amendments to the City's <br /> <br />Comprehensive Plan, official controls, platting or dedication requirements enacted after the date <br /> <br />of this Agreement. <br /> <br />6. DEVELOPMENT PLANS. The Plat shall be developed in accordance with the <br /> <br />following plans ("Plans") which are on file with the City. The Plans shall not be attached to this <br /> <br />Agreement. lfthe Plans vary from the written terms of this Agreement, the written terms shall <br /> <br />control. The Plans are: <br /> <br />Plan C - <br /> <br />Pheasant Marsh 3rd Addition final plat dated <br />Final Grading and Erosion Control Plan dated 02-10-06 prepared by James <br />R. Hill (Grading Plan"). <br />Construction Plan for Sanitary Sewer, Water Main, Storm Sewer, <br />Concrete Sidewalk, Concrete Curb, Gutter, Bituminous Surfacing, and <br />Site Grading, Pheasant Marsh 3rd Addition, dated 01-13-06 prepared by <br />James R. Hill ("Construction Plans"). <br />Soils Investigation Report dated prepared by <br /> <br />Plan A - <br />Plan B - <br /> <br />Plan D - <br /> <br />7. IMPROVEMENTS. The Developer shall install and pay for the following <br /> <br />improvements ("Improvements") as required by the Construction Plans: <br /> <br />A. Sanitary Sewer System <br />B. Water System <br />C. Storm Sewer <br />D. Streets <br />E. Concrete Curb and Gutter <br />F. Street Lights <br />G. Site Grading, Ponding and Erosion Control <br />H. Underground Utilities <br /> <br />Q:\Agreements\Pheasant Marsh 3\Pheasant Marsh 3rd Addition Vl4.doc <br /> <br />Page 3 <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.