Laserfiche WebLink
<br />02-17-06 <br /> <br />1. Setting of Iron Monuments <br />J. Sidewalks and Trails <br />K. Surveying and Staking <br />L. Mailboxes <br />M. Street signage <br />N, Trees, sod and landscaping <br /> <br />All Improvements shall be installed in accordance with the City's subdivision ordinance; <br />City standard specifications for utilities and street construction; and any other applicable <br />ordinances. The Developer shall submit plans and specifications for the Improvements that have <br />been prepared by a competent registered professional civil engineer to the City for approval by <br />the City Council. No changes may be made to the Plans without the City's express written <br /> <br />consent. The Developer shall obtain all necessary permits from other agencies before proceeding <br /> <br />with construction of the Improvements. The Developer shall instruct its engineer to provide <br /> <br />adequate field inspection personnel to assure an acceptable level of quality control to the extent <br /> <br />that the Developer's engineer will be able to certify, as a condition of City acceptance, that the <br /> <br />construction work for the Improvements meet the approved City standards. <br /> <br />In addition, the City may, at the City's discretion and at the Developer's expense, have <br /> <br />one or more City inspectors and its engineer, review plans and inspect the work on a full or part- <br /> <br />time basis. The Developer's expense shall not exceed a cap of$ 46,160, unless Developer <br /> <br />agrees in writing to pay an additional amount or amounts. The cap is the maximum that the <br /> <br />developer shall pay for the work of the city engineer and inspectors; the actual amount the <br /> <br />Developer shall pay will be calculated on a per hour basis for the actual time spent. The hourly <br /> <br />rates will be those set out in the current fee schedule which is attached hereto as Exhibit E. The <br /> <br />Developer shall also pay out-of-pocket expenses for mileage at $0.46 per mile, all of which is <br />included in the cap. To facilitate keeping costs under control, and to allow monitoring of the <br />construction and the associated engineering costs, Developer will provide for biweekly project <br /> <br />construction meetings with the Developers contractor, the Developer's engineer and City's <br /> <br />engineer and other concerned parties. <br /> <br />Q:\Agreements\Pheasant Marsh 3\Pheasant Marsh 3rd Addition V14.doc <br /> <br />Page 4 <br /> <br />'If <br />