Laserfiche WebLink
Stantec <br /> CENTERVILLE SURFACE WATER MANAGEMENT PLAN <br /> STORM WATER CHARGES <br /> September 2012 <br /> Storm Water Area Charge <br /> • Improvements to existing systems due to increased load on the system from new <br /> development. <br /> • Construction and maintenance of trunk storm sewer to serve future developments. <br /> • Construction and maintenance of increased ponding capacity to serve future <br /> developments. <br /> As shown above, the City proposes to structure the fees in such a way as to fund ongoing and <br /> long -term maintenance programs out of the quarterly fee levied to individual property owners. <br /> Capital costs and improvements necessary from the increased load on the storm water system <br /> from new developments will be funded from new development storm water area charges. <br /> One Team. Infinite Solutions. <br /> 9.26 <br /> 45 <br />