My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-10 Handouts @ Worksession
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-10-10 Handouts @ Worksession
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 8:53:51 AM
Creation date
10/18/2012 8:53:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AREA B <br /> This area was eliminated from the 2009 project based on input from the public who <br /> wished to see the overall cost of the project reduced. These streets are being <br /> considered for improvements as part of the last remaining unimproved streets from the <br /> 2003 study which already have city water main. <br /> In the 2009 study, these streets were slated for full reconstruction. However due to the <br /> fact that a reconstruction of the road would trigger the need for costly rain gardens or <br /> other infiltration features, a more limited scope of improvement is being considered. <br /> Area B is proposed to be a part of the project studied under this report. Proposed <br /> improvements include: <br /> • Full bituminous removal and replacement <br /> • Spot repairs of curb and gutter <br /> • Limited draintile installation <br /> STREET IMPROVEMENTS - FULL BITUMINOUS REMOVAL AND REPLACEMENT <br /> Streets in this portion of the project will have the existing gravel section left in place <br /> along with the curb and gutter. The new section will consist of draintile, the existing <br /> gravel base and new bituminous (see Figure 4). Spot repairs to the curb and gutter as <br /> well as to the gravel base could be made as necessary. Draintile could be trenched in <br /> along the front edge of each of the curb lines to help maintain the integrity of the <br /> subbase. <br /> For the most part, curb and gutter in these segments is in good condition and will require <br /> only spot repairs. This means that little or no disturbance behind the curb will take <br /> place, keeping costs at a minimum. <br /> Part of the reason for the deterioration of these streets is often a lack of proper surface <br /> drainage. Therefore, the proposed improvements include additional catch basins and <br /> storm sewer where it is both needed and reasonably feasible. <br /> City of Centerville St an t eC Project No: 193801520 6 <br /> 2013 Street t and Utility Improvement Project Page e 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.