My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-10 Handouts @ Worksession
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2012
>
2012-10-10 Handouts @ Worksession
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 8:53:51 AM
Creation date
10/18/2012 8:53:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF CENTERVILLE - 2013 STREET AND UTILITY IMPROVEMENT PROJECT <br /> Proposed Improvements <br /> AREA A <br /> This area was eliminated from the 2009 project based on input from the public who <br /> wished to see the overall cost of the project reduced and who felt that the street was still <br /> in relatively good condition. Since then, the street has deteriorated, garnering complaints <br /> about its condition to city hall. <br /> Due to recent complaints and favorable bonding rates, city staff felt that this project <br /> should be considered for improvement in conjunction with the 2013 Street <br /> Improvements. The larger project may help to attract more bidders and a lower winning <br /> bid. <br /> Area A is part of the project studied under this report. Proposed improvements include: <br /> • Full Street Reconstruction <br /> • Installation of water main and services (including going into the homes at the <br /> option of the homeowner). <br /> In the early summer of 2012, Stantec, along with City Staff, did a thorough inspection of <br /> all streets identified for the study and their respective existing conditions. Based on this <br /> inspection weighed against cost and other factors, the streets are proposed for the <br /> following levels of repair. <br /> STREET IMPROVEMENTS - FULL RECONSTRUCTION OF THE STREET SECTION <br /> The streets in this area have demonstrated a lack of proper drainage and subbase <br /> material to withstand the high water table and freeze thaw cycle. Therefore, the <br /> proposed improvements include a full reconstruction of the street section. The new <br /> section will add significant depth of section with sand, fabric, draintile and gravel base <br /> (see Figure 4). Additional catch basins and storm sewer where it is both needed and <br /> reasonably feasible will also be included. <br /> Because these improvements will remove and replace curb and gutter and will extend <br /> water services to the property line, a significant amount of front -yard disturbance will be <br /> involved. Boulevards will be restored with sod and driveways will be replaced in -kind. <br /> The amount of sod and driveway replaced on each lot will depend on service locations <br /> and any changes in street grade which may be part of the final design to better fit the <br /> existing topography. <br /> City of Centerville Project No: 193801520 <br /> 2013 Street and Utility Improvement Project J Stantec Page e 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.