Laserfiche WebLink
<br />t-eD U~ Uti l~:ll'p <br /> <br /> <br />HYMH~K ~L~~I~l~,l"~. <br /> <br />ti~ 1 ~4D~-~./~1 <br /> <br />p.l <br /> <br /> <br />. :: ark. Electric,. Ln.Cc> <br /> <br />6920 2315T Lane N.E. Stacy, Mn. 55079 Phone" 651-462-3721 I FaJC" 651.462-6194 I E-man: hymarkelectric@msn.com <br /> <br />QUOTATION <br /> <br />To: City of Centerville Utilities <br /> <br />Date: 1130/06 <br /> <br />Attn: Paul Palzner <br /> <br />Fax: 651-429-8629 <br /> <br />From: Kurt Paddock <br /> <br />Project: City af Centerville Lift Station Enaerg.ncy Generator. <br /> <br />HyMark Electric, Inc. is Quoting the Supply and 8ectricallnstallation of the City of Centerville <br />Standby Emergency Generator and Automatic Transfer Switch for Lift Station # 2. <br /> <br />HyMark is including: All Taxes. 8ectrical Permit. Labor and Material for the installation and <br />wiring of (1) New 75kw. 12OJ208volt, 3 phase. 4 wire, Natural Gas Standby Emergency Generator <br />(Caterpillar I Olympian) in a Outdoor Insulated Weatherproof Enclosure. To be set on a concrete <br />pad per manufactures spec.(by HyMark) on the east side of driveway, with the automatic transfer <br />switch mounted on the backside of the existing lift station control panel. The existing generator <br />receptacle will be removed and turned over to the city upon completion of project All equipment <br />training and testing included per attached Ziegler Power Systems Scope of equipment and work <br />with a (2) year warranty as outlined. <br /> <br />HyMark is excluding: Any Temporary Power, Power Company costs. <br /> <br />-Power Company costs <br />-Telephone Company costs <br /> <br />$-~ <br />$_NA_ <br /> <br />BID SCHEDULE: <br />ITEM No. <br />#1: Centerville lift Station Emergency Generator Installation: $_37,400.00_ <br />(Emergency Generator and Transfer Switch by Ziegler Power included) <br />#2: Natural Gas Piping and Installation: $_7,120.0.0_ <br />(City may elect to install gas piping and coordination for deduct of cost) <br /> <br />TOTAL QUOTE: <br /> <br />$_ 44,520.00_ <br /> <br />*Deduct to go with the same type but 30kw, 100amp Generator and Transfer <br />Switch in place of the quoted 75kw, 200amp Generator and Transfer Switch: $":" 4,000.00_ <br /> <br />Any questions please caD. <br />Thank You. <br /> <br />M <br /> <br />Cell: 651-307.0322 <br />Commercial. Industrial, Specializina in the Municipal Market. <br /> <br />Pages: 4 <br /> <br />~~~':lt-t.~~'.~':-:"':'''''.''''''l'''~-:'.. ..-.... ..... .:..." <br /> <br />&1 <br />