Laserfiche WebLink
<br />J <br />I. .. <br /> <br />" <br />I <br /> <br />I ! <br /> <br />Developer or its engineer shall sched~le a pre-construction meeting at a mutually agreeable time <br />at the City Council chambers with all parties concerned, including the City's consulting engineer <br />and inspector, to review the program for the construction work. Within thirty (30) days after the <br />completion of the Improvements and before the Security is released, the Developer shall supply the <br />City with a complete set of reproducible "as constructed" plans for each Improvement, and two <br />complete sets of blue line "as constructed" plans in electronic format AutoCAD, DWG or a .DXF <br /> <br />'file, all prepared in accordance with City standards using Anoka County coordinates. Before the <br />Security for the completion of Improvements is released in total, iron monuments must be <br />installed in accordance with Minn. Stat. ~ 505.02. The Developer's surveyor shall submit a <br />written notice to the City certifying that the monuments have been installed. . <br />WARRANTY. The Developer warrants all Improvements required to be constructed by it <br />'pursuant to this Agreement against poor material and faulty workmanship. The warranty period <br /> <br />for streets is two years. <br /> <br />, <br /> <br />9. PERMITS. The Developer shall obtain or require its contractors and <br />subcontractors to obtain all necessary permits, including but not limited to: . <br /> <br />. Anoka County for County Road Access and Work in County Rights-of-Way (if any) <br />. NPDES Pe~t for Grading and Erosion Control <br />. MPCA for Hazardous Material Removal and Disposal <br />. DNR for Dewatering <br />. Wetland Conservation Act Permits <br />. City of Centerville for Building Permits <br />. City of Centerville Soil and Erosion Control Permits <br />. City Permits for Utilities such as gas, phone, electric, cable TV <br /> <br />10. TIME OF PERFORMANCE. The Developer shall install all Developer <br />'Installed Improvements in the Plans by December 1, 2006. City installed improvements, with the <br />exception of the final wear course of asphalt on streets shall be completed by December 1, 2006. <br />. ~()()' <br />The final wear course on streets .shall not be installed before J~ly 15,~, but must be installed <br />no later than December 1, 2007. The Developer may, however, request,an extension of time <br />from the City. If an extension is granted, it shall be conditioned upon updating the Security <br /> <br />Agreement Hunter's Cros~ing 3rd v5 <br /> <br />5 <br /> <br />15 <br />